Chapter 2 InstallationChapter 2 Installation
www.supmea.com
- 5 -
The instrument into the mounting hole and then buckle on the Snap, as shown
below
2.2 Electrode installation
Schematic diagram of common installation method
①
Side wall installation
②
Flange mounted at the top
③
Pipe installation
④
Top
installation
⑤
Submersible installation
⑥
Flow-through installation
The interface must be in 15°oblique angle, or it will affect the normal test and use
of the electrode. We won’t be responsible for any results due to this.