Chapter 5: Advanced Serverboard Setup
5-5
5-5 Installing the Processor and Heatsink
!
Avoid placing direct pressure to the top of the processor package. Always
remove the power cord
fi
rst before adding, removing or changing any
hardware components.
Notes:
•
Always connect the power cord last and always remove it before adding, re-
moving or changing any hardware components. Make sure that you install the
processor into the CPU socket before you install the CPU heatsink.
•
If you buy a CPU separately, make sure that you use an Intel-certi
fi
ed multi-
directional heatsink only.
•
Make sure to install the serverboard into the chassis before you install the CPU
heatsinks.
•
When receiving a serverboard without a processor pre-installed, make sure that
the plastic CPU socket cap is in place and none of the socket pins are bent;
otherwise, contact your retailer immediately.
•
Refer to the Supermicro web site for updates on CPU support.
Installing an LGA 2011 Processor
Follow the procedure below, beginning
with the CPU1 socket.
1. There are two levers on the LGA
2011 socket. First press and re-
lease the load lever labeled 'Open
1st'.
2. Press the second load lever
labeled 'Close 1st' to release the
load plate from its locked position.
OPEN 1st
OPEN
1st
WARNING!
WAR
NIN
G!
OPEN 1st
OPEN
1st
WARNING!
WAR
NIN
G!
Press down on the lever labeled
'Close 1st'
Pull lever away
from the socket
Содержание SUPERSERVER 1027GR-TRF
Страница 2: ...SUPER SUPERSERVER 1027GR TRF 1027GR TRFT USER S MANUAL Revision 1 0a...
Страница 6: ...v Preface Notes...
Страница 25: ...2 10 SUPERSERVER 1027GR TRF 1027GR TRFT User s Manual Notes...
Страница 29: ...3 4 SUPERSERVER 1027GR TRF 1027GR TRFT User s Manual Notes...
Страница 61: ...5 28 SUPERSERVER 1027GR TRF 1027GR TRFT User s Manual Notes...
Страница 71: ...6 10 SUPERSERVER 1027GR TRF 1027GR TRFT Series User s Manual Notes...
Страница 105: ...A 2 SUPERSERVER 1027GR TRF 1027GR TRFT User s Manual Notes...
Страница 109: ...B 4 SUPERSERVER 1027GR TRF 1027GR TRFT Series User s Manual Notes...