
5-16
SuperRack User's Manual
6. Redeploy the leveling stands so
that they are all back at the same
level.
7. Push the SuperRack back upright.
Shelves and Slide Rails
Various types of shelves for rack components are available for the SuperRack
system. They come in sizes from 1U-3U in height and are available as vented or
non-vented shelves. All shelves can be mounted with four cage nuts and four panel
screws onto the front EIA posts of the SuperRack.
The SuperRack also has 1U and 2U brackets with cable management troughs that
can mounted to EIA rails for supporting rack components. Use the procedures below
for installing and uninstalling this bracket system.
Installing Brackets with a Cable Management Trough
Note:
There are two sets of screw holes used for mounting casters. The inner
set is for smaller 2.5" casters, while the outer set is for 3" casters. User this outer
set for SuperRack 3" casters.
Note:
Double-check that all screws have lock washers on them and that they
are securely tightened before placing the SuperRack upright.
1. Open the bracket package and
lay out parts for inspection. Make
sure you have all parts and that
they are undamaged.
2. Screw the brackets together
through the second from left
screw hole with a panel screw, so
that the bracket's fl anges are on
the outside.
Содержание SuperRack
Страница 1: ... SUPER SuperRack USER S MANUAL Revision 1 0 ...
Страница 4: ...SuperRack Installation Manual iv Notes ...
Страница 10: ...1 4 SuperRack Installation Manual Notes ...
Страница 22: ...3 8 SuperRack Installation Manual Figure 3 7 EIA Post Numbering 42 41 42 41 Number 42 at Top of Rack ...
Страница 56: ...5 22 SuperRack User s Manual Notes ...