Chapter 5: Optional Accessories
5-13
Installing an EIA Post into a Rack
1. Put the right front post on right
side of frame. The post should be
fl ush to the frame front.
2. Match the adjustable spring screw
holes on the rack's horizontal
struts so that the screw holes
match up with the holes in the
EIA post.
3. Screw in the four retaining screws
through the EIA post and into the
adjustable spring screw holes on
the horizontal struts. Start with the
center two screws and then the
top and bottom screws.
4. Repeat steps 1 through 3 for the
left front post.
Note:
The numbers should be on the inside of the post when you place the
correct post on the correct side. Make sure the proper post is on the proper side
and that both the right and left post numbers match.
5. Adjust the adjustable spring screw
holes for the rear posts so that
they all match up with the same
rules on the rack's horizontal
struts.
6. Place the right rear post into
position in the rack so that it lines
up with the adjustable spring
screw holes.
7. Screw in the three retaining
screws for the right rear post to
secure it, starting with the center
two screws and then the top and
bottom screws.
8. Repeat steps 5 through 7 for the
left front post.
Содержание SuperRack
Страница 1: ... SUPER SuperRack USER S MANUAL Revision 1 0 ...
Страница 4: ...SuperRack Installation Manual iv Notes ...
Страница 10: ...1 4 SuperRack Installation Manual Notes ...
Страница 22: ...3 8 SuperRack Installation Manual Figure 3 7 EIA Post Numbering 42 41 42 41 Number 42 at Top of Rack ...
Страница 56: ...5 22 SuperRack User s Manual Notes ...