SuperRack Installation Manual
2-2
•
This product may be connected to an power system. In all cases, make sure
that the unit is also reliably connected to Earth (ground).
2-2 General Safety Precautions
!
Follow these rules to ensure general safety:
•
Keep the area around the SuperRack system clean and free of clutter.
•
The SuperRack system weighs up to 258.91 lbs (117.44 kg) empty, and has a
shipping weight of up to 331.08 lbs (150.18 kg). The system should be moved
on its casters.
•
Place any system components and accessories that have been removed away
from the system or on a table so that they won't accidentally be stepped on.
•
While working on the system, do not wear loose clothing such as neckties and
unbuttoned shirt sleeves, which can come into contact with electrical circuits or
be pulled into a cooling fan.
•
Remove any jewelry or metal objects from your body, which are excellent metal
conductors that can create short circuits and harm you if they come into contact
with printed circuit boards or areas where power is present.
•
After accessing the inside of the system, close the system back up and secure
it after ensuring that all connections have been made.
Содержание SuperRack
Страница 1: ... SUPER SuperRack USER S MANUAL Revision 1 0 ...
Страница 4: ...SuperRack Installation Manual iv Notes ...
Страница 10: ...1 4 SuperRack Installation Manual Notes ...
Страница 22: ...3 8 SuperRack Installation Manual Figure 3 7 EIA Post Numbering 42 41 42 41 Number 42 at Top of Rack ...
Страница 56: ...5 22 SuperRack User s Manual Notes ...