2-1
Chapter 2: System Safety
Chapter 2
System Safety
2-1 Overview
This chapter provides a quick setup checklist to get your chassis up and running.
Following the steps in order given should enable you to have your chassis setup and
operational within a minimal amount of time. This quick set-up assumes that you are
an experienced technician, famailiar with common concepts and terminology.
2-2 Warnings and Precautions
You should inspect the box the chassis was shipped in and note if it was damaged
in any way. If the chassis itself shows damage, file a damage claim with carrier
who delivered your system.
Decide on a suitable location for the rack unit that will hold that chassis. It should
be situated in a clean, dust-free area that is well ventilated. Avoid areas where heat,
electrical noise and electromagnetic fields are generated.
You will also need it placed near at least one grounded power outlet. When config
-
ured, the SC815 chassis includes one power supply. "R" models include a redundant
power supply and require two grounded outlets.
2-3 Preparing for Setup
The SC815 chassis includes a set of rail assemblies, including mounting brackets
and mounting screws you will need to install the systems into the rack. Please read
this manual in its entirety before you begin the installation procedure.
Содержание SC815S-560
Страница 8: ...SC815 Chassis Manual viii Notes...
Страница 14: ...SC815 Chassis Manual 1 6 Notes...
Страница 28: ...SC815 Chassis Manual 4 8 Notes...
Страница 53: ...6 7 Chapter 6 Rack Installation SCALE 0 380 Figure 6 4 Installing the Outer Rails to the Server Rack 2 3 3...
Страница 56: ...SC815 Chassis Manual 6 10 Notes...
Страница 64: ...SC815 Chassis Manual B 2 Notes...
Страница 83: ...D 11 Appendix D SCA 813S Backplane Specifications Notes...