5-
3
C
hapter
5
:
R
ack
I
nstallation
for
safe
operation
is
not
compromised
.
Mechanical
L
oading
E
quipment
should
be
mounted
into
a
rack
so
that
a
hazardous
condition
does
not
arise
due
to
uneven
mechanical
loading
.
C
ircuit Overloading
C
onsideration
should
be
given
to
the
connection
of
the
equipment
to
the
power
supply
circuitry
and
the
effect
that
any
possible
overloading
of
circuits
might
have
on
overcurrent
protection
and
power
supply
wiring
. A
ppropriate
consideration
of
equipment
nameplate
ratings
should
be
used
when
addressing
this
concern
.
Reliable Ground
A
reliable
ground
must
be
maintained
at
all
times
.
To
ensure
this,
the
rack
itself
should
be
grounded
.
Particular
attention
should
be
given
to
power
supply
connec
-
tions
other
than
the
direct
connections
to
the
branch
circuit
(i
.
e
.
the
use
of
power
strips,
etc
.
)
.
Содержание SC812L Series
Страница 4: ...SC812L Chassis Manual iv Notes...
Страница 9: ...ix Preface Front Panel to the Motherboard A 3 A 4 Chassis Screws A 4...
Страница 10: ...SC812L Chassis Manual x Notes...
Страница 14: ...SC812L Chassis Manual 1 4 Notes...
Страница 22: ...SC812L Chassis Manual 3 4 Notes...
Страница 41: ...5 7 Chapter 5 Rack Installation Figure 5 3 Mounting the Chassis A B Rail Bracket C...
Страница 46: ...SC812L Chassis Manual 5 12 Notes...
Страница 47: ...1 Appendices Appendices Appendix A Compatible Cables...
Страница 48: ...SC812L Chassis Manual 2 Notes...