![Supermicro SuperWorkstation 5039A-I Скачать руководство пользователя страница 21](http://html1.mh-extra.com/html/supermicro/superworkstation-5039a-i/superworkstation-5039a-i_user-manual_1403708021.webp)
21
Chapter 3: Maintenance and Component Installation
OPEN 1st
9.
Close the load plate with the CPU inside the socket. Lock the "Close 1st" lever first,
then lock the "Open 1st" lever second. Gently push the load levers down to the lever
locks.
OPEN 1st
OPEN 1st
Lever Lock
Lever Lock
Push down and
lock 'Open 1st'
lever
Push down and lock
'Close 1st' lever.
Gently close the
load plate.
2
1
3
4