SuperStorage Server 6048R-E1CR90L User's Manual
24
2.3 Installing the Chassis into a Rack
Once rails are attached to the chassis and the rack, you can install the server.
Caution!
The chassis is heavy. Mount or remove the chassis using sufficient personel
and/or a lift. Also, be sure the rack is bolted to the racks next to it or the floor.
1. Pull the middle rails out of the front of the outer rails until they are locked at full
extension.
2. Align the rear of the inner rails with the middle rails and then push evenly on both
sides of the chassis until it clicks into position. The middle rail should stay locked at full
extension.
Figure 2-5. Aligning the Inner Rail with the Middle Rails
3. Pull the thin plastic extension release locking tabs on both inner rails and push the
chassis fully into the rack. The locking tabs should click.
1
2
2
3
Extension Release Tab
Stability hazard
. The rack stabilizing mechanism must be in place, or the rack must
be bolted to the floor before you slide the unit out for servicing. Failure to stabilize the
rack can cause the rack to tip over.
Содержание SuperStorage Server 6048R-E1CR90L
Страница 1: ...USER S MANUAL Revision 1 0 6048R E1CR90L SuperStorage Server...
Страница 13: ...13 Chapter 1 Introduction Chassis Top Figure 1 4 Top View 90 Drives Mounted Vertically...
Страница 33: ...33 Chapter 3 Maintenance and Component Installation Figure 3 2 Access to the Motherboard and Other Components...
Страница 54: ...SuperStorage Server 6048 E1CR90L User s Manual 54 Notes...