5-2
S
UPER
S
ERVER 1015B-M3 User's Manual
Unpacking
The serverboard is shipped in antistatic packaging to avoid electrical static dis-
charge. When unpacking the board, make sure the person handling it is static
protected.
5-2 Serverboard
Installation
This section explains the fi rst step of physically mounting the X7SB3 into the
SC113MTS-560C chassis. Following the steps in the order given will eliminate
the most common problems encountered in such an installation. To remove the
serverboard, follow the procedure in reverse order.
Installing to the Chassis
Access the inside of the system by removing the screws from the back lip of
1.
the top cover of the chassis, then pull the cover off.
The X7SB3 requires a chassis big enough to support a 12" x 9.6"
2.
serverboard, such as Supermicro's SC113MTS-560C.
Make sure that the I/O ports on the serverboard align properly with their
3.
respective holes in the I/O shield at the back of the chassis.
Carefully mount the serverboard to the serverboard tray by aligning the board
4.
holes with the raised metal standoffs that are visible in the chassis.
Insert screws into all the mounting holes on your serverboard that line up
5.
with the standoffs and tighten until snug (if you screw them in too tight, you
might strip the threads). Metal screws provide an electrical contact to the
serverboard ground to provide a continuous ground for the system.
Finish by replacing the top cover of the chassis.
6.
Содержание SUPERSERVER 1015B-M3
Страница 1: ...SUPER USER S MANUAL Revision 1 0 SUPERSERVER 1015B M3...
Страница 5: ...v Preface Notes...
Страница 10: ...Notes SUPERSERVER 1015B M3 User s Manual x...
Страница 16: ...1 6 SUPERSERVER 1015B M3 User s Manual Notes...
Страница 23: ...Chapter 2 Server Installation 2 7 Figure 2 4 Installing the Outer Rails to the Rack 2 3 3...
Страница 28: ...2 12 SUPERSERVER 1015B M3 Manual Notes...
Страница 94: ...A 2 SUPERSERVER 1015B M3 User s Manual Notes...