SC936 Chassis Manual
5-2
5-4 Warnings and Precautions
Rack Precautions
Ensure that the leveling jacks on the bottom of the rack are fully extended to
•
the floor with the full weight of the rack resting on them.
In single rack installations, stabilizers should be attached to the rack.
•
In multiple rack installations, the racks should be coupled together.
•
Always make sure that the rack is stable before extending a component from
•
the rack.
You should extend only one component at a time - extending two or more si-
•
multaneously may cause the rack to become unstable.
General Server Precautions
Review the electrical and general safety precautions that came with the com-
•
ponents you are adding to your chassis.
Determine the placement of each component in the rack
•
before
you install the
rails.
Install the heaviest server components on the bottom of the rack first, and then
•
work upwards.
Use a regulating uninterruptible power supply (UPS) to protect the server from
•
power surges, voltage spikes and to keep your system operating in case of a
power failure.
Allow the hot plug hard drives and power supply modules to cool before touch-
•
ing them.
Warning!
!
!
Содержание Supero SC936 Series
Страница 18: ...SC936 Chassis Manual 3 4 Notes ...
Страница 30: ...SC936 Chassis Manual 4 12 Notes ...
Страница 40: ...SC936 Chassis Manual 5 10 Notes ...
Страница 46: ...SC936 Chassis Manual B 2 Notes ...