23
Chapter 2 Installation and Setup
10.
Replace the screws in the order 1-2-3, tightening to 16.1 kgf-cm (14 lbf-in) of torque.
The Force Frame secures both the Rail Frame and CPU Package.
Caution:
Tightening must be executed in proper 1-2-3 sequence to avoid causing catastrophic
damage to the socket or CPU Package.
Figure 2-10. The Force Frame Secured
Figure 2-9. Securing the Force Frame
Содержание SuperBlade SBA-4119SG
Страница 1: ...USER S MANUAL Revision 1 0 SuperBlade Server SBA 4119SG...
Страница 11: ...11 Chapter 1 Introduction 1 5 Components Figure 1 4 Components Labeled see the next page 1 5 4 3 2...
Страница 50: ...SuperBlade Server SBA 4119SG User s Manual 50 Save Exit Save Options Default Options Boot Override...