19
Chapter 2 Installation and Setup
Installing the Processor and Heatsink
Begin by removing power from the system as described in Section 2.3.
1.
Use a Torx T20 driver to loosen the screws holding down Force Frame in the sequence
of 3-2-1. The screws are numbered on the Force Frame next to each screw hole.
Tighten to 16.1 kgf-cm (14 lbf-in) of torque.
Screw #1
Screw #2
Screw #3
Force Frame
Figure 2-3. Removing the Processor Force Frame