4-1
Chapter 4
Installing the Switch
This chapter covers switch installation.
4-1
Package Contents
After unpacking the switch, check the contents to be sure you have received all the
additional accessories.
•
Bracket Mounting Kit containing two brackets and eight screws for attaching the
brackets to the switch
•
Power cord (two)
•
Console cable (DB-9 to DB-9)
4-2
Switch Chassis
The SSE-X3348T/SSE-X3348TR switch is designed to be installed in a standard
19-inch equipment rack. Be sure to take into account switch cooling requirements.
Before continuing with switch installation, first review the general guidelines and switch
cooling requirements in this chapter.
General Installation Guidelines
Be sure to follow the guidelines below when choosing a location.
•
The installation location should:
•
be able to maintain its temperature within 0 to 45 °C (32 to 113 °F) and its
humidity within 5% to 95%, non-condensing.
•
provide adequate space (approximately five centimeters or two inches) on all
sides for proper air flow.
•
be accessible for installing, cabling and maintaining the device.
•
allow the status LEDs to be clearly visible.
•
Make sure twisted-pair cable is always routed away from power lines, fluorescent
lighting fixtures and other sources of electrical interference, such as radios and
transmitters.
•
Make sure that the unit is connected to a separate grounded power outlet within 2 m
(6.6 feet) of each device and is powered from an independent circuit breaker. As
with any equipment, using a filter or surge suppressor is recommended. Verify that
the external power requirements for the switch can be met as listed under
Содержание SSE-X3348T
Страница 1: ...SSE X3348T and SSE X3348TR 48 Port 10G Top of Rack Switches Installation Manual Revison 1 0 ...
Страница 6: ...SSE X3348T SSE X3348TR Switch Installation Manual vi Notes ...
Страница 10: ...SSE X3348T SSE X3348TR Switch Installation Manual x Notes ...
Страница 14: ...SSE X3348T SSE X3348TR Switch Installation Manual 1 4 Notes ...
Страница 32: ...SSE X3348T SSE X3348TR Switch Installation Manual 2 18 Notes ...
Страница 39: ...4 3 Chapter 4 Installing the Switch Figure 4 1 Switch Cooling B2F Airflow SSE X3348TR F2B Airflow SSE X3348T ...
Страница 42: ...SSE X3348T SSE X3348TR Switch Installation Manual 4 6 Figure 4 2 Connecting AC Power 1 2 ...
Страница 50: ...SSE X3348T SSE X3348TR Switch Installation Manual 4 14 Notes ...
Страница 61: ...5 11 Chapter 5 Making Network Connections ...
Страница 65: ...SSE X3348T SSE X3348TR Switch Installation Manual 6 4 Notes ...
Страница 72: ...SSE X3348T SSE X3348TR Switch Installation Manual 8 3 ...
Страница 74: ...SSE X3348T SSE X3348TR Switch Installation Manual ...