Chapter 5: Chassis Installation
5-5
Figure 5-2. Extending and Releasing the Inner Rail
Releasing the Inner Rail
Each inner rail has a locking latch. This latch prevents the server from coming
completely out of the rack when when the chassis is pulled out for servicing.
To mount the rail onto the chassis, first release the inner rail from the outer rails.
Releasing Inner Rail from the Outer Rails
1. Pull the inner rail out of the outer rail until it is fully extended as illustrated below.
2. Press the locking tab down to release the inner rail.
3. Pull the inner rail all the way out.
4. Repeat for the other outer rail.
1
1
1
2
1
3
Содержание SC216 Series
Страница 1: ...USER S MANUAL Revision 1 0 SC216 Storage Enclosure Series SC216BE1C R741JBOD SC216BE2C R741JBOD...
Страница 30: ...2 20 SC216 JBOD Chassis Manual Notes...
Страница 45: ...4 11 Chapter 4 Chassis Setup and Maintenance Figure 4 10 Placing the System Fan...
Страница 62: ...SC216 JBOD Chassis Manual A 2 Notes...
Страница 89: ...C 9 Appendix C CB3 JBOD Control Board Notes...