FatTwin AS -F1114S-RNTR User's Manual
38
8. Gently lower the Rail Frame down onto the socket until the latches on the Rail Frame
engage with the Socket housing. and it rests in place. DO NOT force it into place!
9. Gently lower the Force Frame down onto the Rail Frame and hold it in place until it is
seated in the Socket housing. Note that the Force Frame is spring loaded and has to be
held in place before it is secured.
Important: Use a torque screwdriver, set it at 16.1
kgf-cm (14.0 lbf-in) with a Torx T20 screw head bit, to prevent damage to the CPU.
10. Place and re-screw the screws in the reverse order to the way you removed them
(holes 1-2-3 in order). When finished, the Force Frame will be secure over both the Rail
Frame and CPU Package.