background image

NOTE: DIAGRAMS & ILLUSTRATIONS NOT TO SCALE.

8

Step 4.

 Fireplace should be secured to side

framing members using the full length nailing
tabs at the top and bottom of the fireplace front
face.  Use 8d nails (

Figure 17 ).

Figure 17

Note:

 The nailing tabs and the area directly

behind the nailing tabs are exempt from the
clearances described on page 5.  Maintain at
least 1/2" clearance from the firebox wrapper to
the framing at the closest point of contact,
directly adjacent to the flange.

For Canadian Installations

A cold Climate Kit FTF8-CCK3-LD must be
installed.

  CCK3 kits are available from

FireCraft through your local dealer.  Installer
must supply suitable length of 6" Diameter,
class "0" metallic air duct.

Proceed with Steps 5 through 8

Step 5.

 Install the Cold Climate Kit to the

fireplace following the instructions provided
with the kit, (

Figure 18 ).

8d Nail

Figure 20

Step 3.

 Position appropriate firestop spacer at

ceiling and nail temporarily with two (2) 8d
nails. Use flat firestop spacer, Model F8FS-2, if
chimney penetrates ceiling vertically. If chim-
ney penetrates ceiling at 30

°

 angle (offset chim-

ney), use 30

°

 firestop spacer, Model F8FS30.

Use one nail on opposite sides to hold firestop
spacer in position. Nail permanently, using at
least two (2) more 8d nails, after chimney
sections have been assembled through the
firestop spacer and after any necessary adjust-
ments have been made. Firestop spacer must
be secured by at least four (4) 8d nails when
completely installed.

CAUTION: ALLOW MINIMUM 1"* CHIMNEY
AIR SPACE TO COMBUSTIBLE FRAMING MEM-
BERS THROUGHOUT VERTICAL OR OFFSET
CHIMNEY INSTALLATION.

A minimum 1"* air space must be reserved for
all combustible materials extending for any
continuous length surrounding the chimney.

*Note: 2" clearance to combustibles required
in Canada.

Reference 

Figures 15 and 16 and charts Fram-

ing Dimensions for Ceiling and Roof, which
specify minimum ceiling and roof dimensions.

In new construction, to determine chimney cen-
ter line, use plumb line from roof or ceiling above
fireplace to center of flue collar on fireplace.

For remodeling, plumb to center of flue collar
from ceiling above, drive nail through ceiling
from below to mark position, then mark and cut
to passage from above ceiling (around nail)
(

Figure 20 ). Then plumb from ceiling or roof

level directly above hole which has just been
completed.

Figure 18

Step 6.

 Connect the 6" (102 mm) Class 0 air

duct provided by installer, to the duct collar on
the fireplace and secure with two (2) screws
from the kit’s hardware package.

Step 7.

 Route the Class 0 air duct out the back

or side wall, up through the ceiling or floor
joists to an outside wall. The air inlet hood
should be located above snow level or above
any anticipated snow level, (

Figure 19 ).

Figure 19

Note:

 If the fireplace is installed against an inside

wall, the class 0 air duct may be extended into a
ventilated attic space at least 18" (475mm) above
the attic floor.  Secure the air inlet hood to a
vertical post with the inlet positioned downward.
Ensure that nothing blocks the hood opening.
This hood must never terminate higher than
three (3) feet below the termination.

Step 8.

 Cut or frame a hole through the outside

wall for the installation of the air inlet hood.  A 6-
1/2" diameter hole is required.  Feed the loose
end of the flexible duct through the hole and
attach to the collar on the air inlet hood using two
(2) screws from the kit's hardware package.
Insert the hood into the opening.  Secure the inlet
hood in place with nails driven through the holes
in the flange.  Seal with noncombustible water-
proof silicon type caulking.

INSTALLING THE CHIMNEY SYSTEM

Step 1.

 Before continuing, check the operation

of the damper, as described on page 4, (

refer to

Figure 3 ).

Step 2.

 Using standard construction framing

techniques, construct opening for chimney route
up through the ceiling(s) and roof or through an
outside chase.

Framing must maintain adequate minimum air
space clearance at all times.

Install As Shown With
Opening In Downward

Position Do Not Block

Entrance

5 Foot Min. Height
From Outside
Ground Level

Содержание BC-42

Страница 1: ...r or modify the fireplace or its components under any circumstances Any modification or alteration of the fireplace system including but not limited to the fireplace chimney components and accessories...

Страница 2: ...hysical damage as a result of handling or transporta tion These items should be inspected by your distributor or qualified factory representative to ensure safe condition When in doubt con sult your d...

Страница 3: ...11 and in accordance with codes such as the BOCA Basic National Codes the Standard Me chanicalCodeandtheUniformBuildingCodes When complete these fireplace systems con sists of five basic sub systems 1...

Страница 4: ...ermal Barrier 8 Level Chase Enclosure A chase is a vertical box like structure con structedtosurroundthefireplaceandchimney Refer to Figure 2 for a typical chase configura tion As with all chimney ins...

Страница 5: ...l safety strips beneaththefireplaceasillustrated Figures6 7 and 8 The safety strips should overlap for continual coverage of the floor Note Safety strips are not required when fire place rests on a no...

Страница 6: ...surface If a wall covering such as drywall is to be attached to the rear wall then the 20 524 mm must be measured from the drywall surface It is important that this dimension be exact If the appliance...

Страница 7: ...Shown FOAK Combustion Air Kit Optional Note All framing dimensions calcu lated for 1 2 dry wall at the fireplace face Ifsheathingthechaseorfinish ing with other thickness materials calculations will...

Страница 8: ...nsions In new construction to determine chimney cen terline useplumblinefromrooforceilingabove fireplace to center of flue collar on fireplace For remodeling plumb to center of flue collar from ceilin...

Страница 9: ...ign which ensures an immediate tight assembly between sections Plan your chimney require ments carefully before assembly as chimney is difficult to disassemble after installation If disassembled the t...

Страница 10: ...ht dam age the chimney section refer to Figure 32 Note If chimney extends more than 8 above roof surface guy wires are also recommended Use three 3 guy wires attach to locking band assembly extend and...

Страница 11: ...Thetopofthechimneymustbeatleast2 above this reference point In all cases the chimney cannotbelessthen3 abovetheroofattheedge of the chimney The 2 in 10 rule is necessary in the interest of safety but...

Страница 12: ...374 31 2 0 1 1 7 380 31 8 1 0 0 8 Step 2 Use Height of Chimney Only column in The Vertical Elevation Chart to determine combinations of chimney used above return elbow to achieve desired heights Refer...

Страница 13: ...35 69 1 0 0 1 0 1 37 73 1 0 0 2 1 0 38 75 1 0 0 0 2 0 39 77 1 0 2 1 1 0 41 80 1 0 1 4 0 0 43 83 1 0 1 0 2 0 44 85 1 0 0 0 1 1 45 87 1 0 0 3 1 0 46 89 1 0 0 1 2 0 48 91 1 0 2 0 2 0 49 94 1 0 1 0 1 1 50...

Страница 14: ...ection Joints No 8 x 1 2 SMS S c r e w s R e q u i r e d A t E v e r y J o i n t P a s t 6 N o S c r e w s R e q u i r e d I n J o i n t s F o r F i r s t 6 o f O f f s e t 4 6 Underside Of Chimney Ch...

Страница 15: ...ck all connections with soap suds leaks will bubble Never test any gas line con nection with a match or open flame This provision is intended for connection to a decorative gas appliance incorporating...

Страница 16: ...of millboard or a du rable noncombustiblematerialhavinganequal or greater insulating value than K 54BTU IN FT2 HR F At no time may a perpendicular side wall be positioned closer than 9 inches Figure...

Страница 17: ...R values are used to determine acceptable combinations of materi als because R values are additive where r and k values are not Hearth Extension Dimensions A 16 B 35 C 8 D 51 A B D C C R value 1 r x...

Страница 18: ...um of all R values is 70 10 068 10 968 This would not be an acceptable combination of material for the hearth extension since the total calculated R value of the materials used is under the required R...

Страница 19: ...63L42 FTF8 CTD Chase Termination Square 63L48 FTF8 CT1 Chase Termination Round 63L45 FTF8 CTDT Chase Termination Square 63L51 FTF8 CT2 Forced Air Blower Kits Single Speed 80L84 FBK 100 Variable Speed...

Страница 20: ...M REV C 11 2003 The manufacturer reserves the right to make changes at any time without notice in design materials specifications prices and also to discontinue colors styles and products Consult your...

Отзывы: