SuperiorFireplaces.us.com
127008-01_H
12
VENTING INSTALLATION
Continued
Opening
"
A
"
17
"
(432 mm)
Min.
30
"
(762 mm)
Min.
1
"
(26 mm)
Min
1
"
(26 mm)
Min
1
"
(26 mm)
Min
Roof Opening 36" Models
Pitch
Slope Opening
"A" Max.
Used Flashing
Model No.
Flat
0°
17"
V6F-10DM
0-6/12
26.6°
19"
V6F-10DM
6/12-
12/12
45.0°
24"
V12F-10DM
Roof Opening 42" and 50" Models
Pitch
Slope Opening
"A" Max.
Used Flashing
Model No.
Flat
0°
19.5"
V6F-10DM
0-6/12 26.6°
22'
V6F-10DM
6/12-
12/12
45.0°
27"
V12F-10DM
30
"
(762 mm)
Min.
Opening
"
A
"
19-
1
/
2
"
(496 mm)
2
"
(51 mm)
Min
2
"
(51 mm)
Min
2
"
(51 mm)
Min
Figure 15 - Roof Opening Measurements
Nail Only
Outer
Perimeter
of Flashing
Storm Collar
Flashing Cone
Underlap Shingles
at Bottom
Overlap Shingles
Top and Sides Only
Figure 16 - Flashing Installation
Figure 17 - Storm Collar
Chimney
Pipe
Waterproof
Caulk
Storm Collar
Flashing
FLASHING INSTALLATION (V6F-10DM OR V12F-10DM)
Determine the flashing to be used with the roof opening chart. Slide
flashing over pipe until base is flat against roof. Replace as many
shingles as needed to cover exposed area and flashing base. Secure
in position by nailing through shingles (see Figure 16). DO NOT NAIL
THROUGH FLASHING CONE.
Installing Flashing on a Metal Roof
When installing the flashing on a metal roof, it is required that putty
tape be used between the flashing and the roof. The flashing must be
secured to the roof using #8 x 3/4" screws and then sealed with roof
coating to prevent leakage through the screw holes. A roof coating
must also be applied around the perimeter of the flashing to provide
a proper seal.
Storm Collar Installation (SC2-1)
Place storm collar over pipe and slide down until it is snug against
the open edge of the flashing (see Figure 17). Apply waterproof caulk
around the perimeter of the collar to provide a proper seal.