Bottom of Firebox
Opening
Bottom of Firebox
Opening
Bottom of Firebox
Opening
Figure 12C - Installation Options
See below for detailed installation options
2.
Standard flush install with non-combustible material flush with
facade
4.
Proud install with non-combustible material flush with facade.
3.
Proud install with non-combustible material behind facade.
1.
Standard flush install with non-combustible material behind facade.
Drywall
Non-combustible
Material
Non-combustible
Material
Non-combustible
Material
Non-combustible
Material
Inches (millimeters)
Drywall
Facade
Facade
Facade
Facade
Drywall
Drywall
Jack Stud
Jack Stud
Jack Stud
Jack Stud
32-1/2 (826)
32-1/2 (826)
31-1/2 (826)
22-3/8
(569)
28-3/8
(721)
28-3/8
(721)
Louvered Facade with Arched Opening
(must be paired with an arched door)
Louvered Facade with Square Opening
(must be paired with a square door)
Clean Face with Square Opening
(must be paired with a square door)
FACADE DIMENSIONS
NOTE
: The facade depth can be
adjusted to cover facing materi-
als ranging from1/2” to 1” thick.
For facing materials exceeding
1”, room must be left for the
façade to install within the facing
material around its perimeter.
7-1/4 (184)
8-5/8 (219)
8-5/8 (219)
NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE.
13