
6-1
Chapter 6: Rack Installation
Chapter 6
Rack Installation
This chapter provides instructions and tips for installing the chassis into a rack.
6-1 Preparing for Setup
Please read this section in its entirety before beginning the installation procedure.
Choosing a Setup Location
Decide on a suitable location for the rack. It should be a clean, dust-free area that is
ZHOOYHQWLODWHG$YRLGDUHDVZKHUHKHDWHOHFWULFDOQRLVHDQGHOHFWURPDJQHWLF¿HOGV
are generated. Place it near a grounded power outlet.
t
Leave at least 25 inches clearance in front of the rack to open the front door
completely.
t
Leave approximately 30 inches of clearance in the back of the rack to allow for
VXI¿FLHQWDLUÀRZDQGHDVHLQVHUYLFLQJ
t
Install in a restricted access location, such as a dedicated equipment room or
service closet.
Ambient Operating Temperature
If installed in a closed or multi-unit rack assembly, the ambient operating tempera-
ture of the rack environment may be greater than the ambient temperature of the
room. Install the equipment in an environment compatible with the manufacturer’s
maximum rated ambient temperature (TMRA).
$GHTXDWH$LUÀRZ
(TXLSPHQWVKRXOGEHPRXQWHGLQWRDUDFNVRWKDWWKHDPRXQWRIDLUÀRZUHTXLUHG
for safe operation is not compromised.
Содержание SC505
Страница 1: ...SC505 Chassis SUPER USER S MANUAL 1 0 ...
Страница 28: ...2 20 SC505 Chassis Manual Notes ...
Страница 34: ...SC505 Chassis Manual 4 4 Notes ...