9
CONTROL
Connections to Building Electrical System
Connections for standby power to a building electrical system must be made by a qualified electrician.
The connection must isolate the generator power from utility power, and must comply with all
applicable laws and electrical codes. A transfer switch, which isolates generator power from utility
power, is available through authorized generator dealer.
WARNING
Improper connections to a building electrical system can allow electrical current from the generator to
back feed into the utility lines. Such back feed may electrocute utility company workers or others who
contact the lines during a power outage and the generator may explode, burn, or cause fires when
utility power is restored. Consult the utility company or a qualified electrician.
Ground Terminal
The generator ground terminal is connected to the frame of the generator, the metal non-current
carrying parts of the generator, and ground terminals of each receptacle.
Before using the ground terminal, consult a qualified electrical inspector or local agency having
jurisdiction for local codes or ordinances that apply to the intended use of the generator.
Содержание PR2800
Страница 5: ......
Страница 36: ...2 TROUBLESHOOTING WIRING DIAGRAM ...
Страница 37: ...TRANSPORTING STORAGE 3 ...
Страница 38: ...4 TROUBLESHOOTING ...
Страница 39: ...TRANSPORTING STORAGE 5 ...