ALTIRANDO
LITE
| page 18
Harness User’s manual
| ALTIRANDO
LITE
INSTALLING THE RESERVE PARACHUTE
Locking the reserve parachute handle.
3
- Secure the installation by pushing the right side of the yellow cable
through the loop cord «1» then, the sleeve.
- Secure the installation by pushing the left side of the yellow cable
through the loop cord «5» then, the sleeve.
-
Carefully remove the line.
- Insert the and ends of the handle in their respective housing,
then push the magnet flap in place to secure the handle.
1
5
A
B
A
C
E
C
D
E
1
5
Check the completed
installation during a
hang-test.
Have the installation checked by a professional outfit.
Conduct an extraction test every six ( 6 ) months to assure proper
system functionality.
Note : conducting and extraction test does not imply deploying the
reserve parachute which will stay inside its POD.
Mandatory extraction test procedure
D
B