![SUNWARD SWE25UF Скачать руководство пользователя страница 52](http://html1.mh-extra.com/html/sunward/swe25uf/swe25uf_operation-and-maintenance-manual_1401102052.webp)
47
5)
Mark hand rigging on the load to ensure the people pulling hand rigging is away from load.
6)
Try to lift the load before normal operation.
⚫
Park the machine beside the load.
⚫
Load the machine.
⚫
Lift load to the height of 50mm (2in) off the ground.
⚫
While keeping the load close to ground, move the load from the machine.
⚫
If there is any evidence of stability reduction, lower load to the ground.
7)
Just lift the load to required height.
3.7 HYDRAULIC BREAKING OPERATION
Hydraulic breaking operation tips…if equipped
Choose hydraulic breaker with correct dimension and weight. Consult with your dealer.
Pump / Main valve section assignment
The hydraulic pressure of section AUX (the hydraulic pressure of the breaker section) supplied
by P2 is 21 M Pa.
Attention to hydraulic breaker tubing
1)
When the hydraulic breaker is out of use, cover the
pipe end of arm and fit a plug at the end of
hydraulic breaker hose to avoid dirt entering into
system.
2)
Ensure
stocking
cover
and
plug
in
tool
compartment for maintenance purpose.
3)
Avoid dirt entering into system when change bucket with breaker.
4)
After connection, check the oil leakage and bolts slack condition.
Before fitting hydraulic breaker on the arm, read
machine and hydraulic breaker manuals carefully, and
carry out the required confirmation or inspection.
Carry out required inspection before daily
operation.
1)
Operate machine slowly, the stability of machine
will be decreased because the hydraulic breaker is
heavier than the bucket. Therefore, use dozer
blade to support and work in front of dozer blade.
FIG. 3-38
FIG. 3-39
Содержание SWE25UF
Страница 33: ...28 2 15 IDENTIFIER Gravity center mark Pull hook mark 750610020148 Foot pedal dropping mark...
Страница 103: ...98 8 ATTACHMENT 8 1 ELECTRIC DRAWING...
Страница 104: ...99 8 2 HYDRAULIC DRAWING...