![SunSynk SUNSYNK-3.6K-SG01LP1 Скачать руководство пользователя страница 17](http://html1.mh-extra.com/html/sunsynk/sunsynk-3-6k-sg01lp1/sunsynk-3-6k-sg01lp1_user-manual_1400629017.webp)
HYBRID INVERTER | Installer Manual
17
Inverter hanging plate installation
4.5. Battery Connection
For safe operation and compliance, a separate DC over-current protector or disconnect device is required
between the battery and the inverter. Switching devices may not be required in some applications, but
over-current protectors are still required. Refer to the typical amperage in the table below for the required
fuse or circuit breaker size.
Model
Wire Size
Cable (mm
2
)
Torque value (max.)
3.6kW / 5kW
3AWG
25
5.2N.m
Inverter Hanging plate installation