SunStone Power SLPO48-100 Скачать руководство пользователя страница 1

LITHIUM BATTERY PACK

USER MANUAL

MODEL: SLPO48-100

 Please read this manual before using the battery pack

 Please keep this manual properly after reading

Содержание SLPO48-100

Страница 1: ...LITHIUM BATTERY PACK USER MANUAL MODEL SLPO48 100 Please read this manual before using the battery pack Please keep this manual properly after reading...

Страница 2: ...scharging 20 55 C 1month 20 45 C 3 months 10 45 C 6 months 0 25 C humidity 45 90 RH The battery should be cycled every three months After 6000 cycles at 25 C 50A charge and discharge 80 DOD recoverabl...

Страница 3: ...tonepower com 2 Structural characteristics and interface definition A Basic structure 2mm sheet metal box structure and rack B Installation method screw lock C Surface coating add spray paint 2 1 Over...

Страница 4: ...POWER switch until the red light turns on first the green light turns on but the switch shouldn t be released The system self checks when the red light is flashing about 10S After that the battery wi...

Страница 5: ...and battery pack status OK or abnormal code On the next page you can view the maximum and minimum voltage maximum and minimum tem perature of the battery User can view the voltage of each cell on pag...

Страница 6: ...rm E51 Module overvoltage level 1 alarm E52 Module overvoltage level 2 alarm E61 Module undervoltage level 1 alarm E62 Module undervoltage level 2 alarm E71 Module charging overcurrent level 1 alarm E...

Страница 7: ...ormal operation temp Tpmin Tpmax C 10 Tpmin 35 20 Tpmin 15 Tpmin 20 75 Tpmax 85 Tpmax 85 60 Tpmax 65 Tpmax 65 13 15 65 75 57 60 Code E121 E122 E111 E112 E111 E112 Temp protection recovery value C dela...

Страница 8: ...delay 5S Dry contact output Dry contact 1 action Dry contact 1 action Remark No code displayed Code Charge E71 Discharge E81 Charge E72 Discharge E82 E83 75 75 Imax 105 Imax 105 Imax 200 within 1mS 7...

Страница 9: ...nsistent with the displayed current If the difference is large the BMS current may be inaccurate and needs to be replaced by a professional or authorized person Check whether the load of the battery i...

Страница 10: ...at the charging equipment performs charging according to the voltage and current regulationsent by the BMS to ensure that the battery will not be overcharged 5 Check the connection of the battery pack...

Страница 11: ...onnect the whole system in series or parallel operation with other batteries These operations may cause personal injury or property lose If necessary please contact the relevant technical depart ment...

Отзывы: