11
2.5) Repair and Maintenance
When machine repair is needed, it shall be conducted by SunStar A/S
engineers only who have finished the due training course.
1) For cleaning and repair, cut the main power supply. Wait for 4 minutes before starting
maintenance to make the machine completely discharged.
2) Do not modify the machine specifications or parts without substantial consultations with
SunStar. Otherwise, it may threaten safety during machine operation.
3) Use the parts manufactured by SunStar to repair or replace the machine parts during
A/S service.
4) When repairing is completed, re-install all the removed safety covers.
Danger
For main shaft motor and X,Y drive box, it takes 10 minutes before they
are completely discharged after the main power is cut.
Caution
2.6) Devices for Safety
ⓐ
Safety label : It describes cautions during operating the machine.
ⓑ
Thread take-up lever : It prevents from any contact between body and take-up lever.
ⓒ
Motor cover: Prevents any possible accidents while the motor is in motion.
ⓓ
Step motor cover : It prevents from accidents during rotation of step motors.
ⓔ
Label for specification of power : It describes cautions for safety to protect against
electric shock during rotating the motors.
ⓕ
Safety plate : It protects eyes against needle breaks.
ⓖ
Finger guard : It prevent from contacts between a finger and needle.
Caution
ⓒ
ⓑ
ⓐ
ⓐ
ⓔ
ⓕ
ⓖ
ⓓ
Содержание SPS/E-1306 Series
Страница 2: ......
Страница 18: ...18 4 5 4 Food pedal switch connection Connect a plug of pedal switch with control box Pedal Switch ...
Страница 49: ...49 9 6 Air System Ciruit Diagrams 9 6 1 SPS E 1306 1507 HS 20 ...
Страница 50: ...50 9 6 2 SPS E 1306 1507 HS 21 ...
Страница 51: ...51 9 6 3 SPS E 1306 1507 HS 22 ...
Страница 52: ...52 9 6 4 SPS E 1306 1507 HS 22 1 ...
Страница 53: ...53 1 10 0 DRAWING OF TABLE 10 1 SPS E 1306 1507 Series ...