12
A
A
INSTRUCTIONS
You have now completed part 1 of
the installation process. Leave the
sealant to dry for 24 hours before
starting part 2.
!
Make sure that the frames
are mounted on the wall,
instead of flush with the
wall. This is to guarantee a
waterproof seal around the
Sunshower.
INSTALLATION
WALL FRAME
INSTALLATION MANUAL PURE XL | PART 1 | P1628 REV B
Содержание PURE XL
Страница 1: ...PURE XL WHITE BLACK INSTALLATION GUIDE PART I PREPARATION P 2 P 13 P 24 P 46 P 35...
Страница 2: ...2 PURE XL WHITE BLACK ARTICLE NO 80074 WHITE 80064 BLACK INSTALLATION GUIDE PART I PREPARATION...
Страница 13: ...13 PURE XL WHITE BLACK ARTIKELNR 80074 WIT 80064 ZWART INSTALLATIEHANDLEIDING DEEL I VOORBEREIDING...
Страница 24: ...24 PURE XL WHITE BLACK ARTIKELNUMMER 80074 WEISS 80064 SCHWARZ INSTALLATIONSHANDBUCH TEIL I VORBEREITUNG...
Страница 35: ...35 PURE XL WHITE BLACK ARTICOLO N 80074 BIANCO 80064 NERO MANUALE DI INSTALLAZIONE PARTE I PREPARAZIONE...
Страница 46: ...46 PURE XL WHITE BLACK NUM RO D ARTICLE 80074 BLANC 80064 NOIR MANUEL D INSTALLATION PARTIE I PR PARATION...