- 6 -
SXJS3018 DOUBLE-DECK SCISSOR LIFT
Fig. 5 Hydraulic pump station
attention, 220V motor, the diameter specifications of the power line is not
less than 4.0mm
2
,380V motor is not less than 2.5mm
2
. To ensure that
power is not lack of phase, the voltage is normal, and then click UP button (no
more than 3 seconds), check the motor rotation direction is correct. If rotation is
right, the oil export pumps out, no oil shows that motor is reversal. Need adjust
any two position to change the motor rotation direction.
Connected to the gas source according to the pneumatic system connection
diagram
(
Fig. 4
)
3.6 Pipe connection
Power on, click UP button to confirm the oil outlet on pipe connector, Refer to
Fig.3 Hydraulic system connection diagram and Fig.5 hydraulic pump station to
connect pipes.
Fig.4 Pneumatic system connection diagram
No.
Name
Remarks
1
Motor
2
Relief valve
3
Throttling valve
4
Cut-off valve
5
Emergency interface
6
Pressure gauge
7
Unloading valve
8
Balancing valve
9
pipe connector
10
pipe connector
11
Tank
No. Name
Remarks
1
To Air Compre-
ssor
2
Pneumatic FRL
3
Air Valve
4
Air
connector
5
Air Cylinder