![Sunshine SXJS3018 Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/sunshine/sxjs3018/sxjs3018_manual_1400122010.webp)
- 8 -
SXJS3018 DOUBLE-DECK SCISSOR LIFT
Fig. 7
Pneumatic system schematic
valve is adjusted well in factory, it
’
s forbidden to adjust than the rated load.)
4.2 When you use the lift first time after installation, pay attention to the
direction of motor rotation while connecting wires. If the motor is rotating in the
wrong direction for too long time, the gear pump could be damaged.
Fig. 6 Hydraulic system diagram
Chapter 5. Pneumatic System
The connection of the pneumatic system refer to Fig. 4. The schematic of the
pneumatic system refer to Fig. 7.
No.
Name
Remark
1
Oil tank
2
Purolator
3
Lubricant pump
4
Motor
5
Retaining valve
6
Relief valve
7
Unloading valve
8
Throttle valve
9
Cut-off valve
10
Cut-off valve
11
Hydraulic gauge
12
Vice-cylinder
13
Main cylinder
1. Air Compressor (customer self-provided)
2. Pneumatic FRL
3. Air Valve
4. Air Cylinder