SXJS3018 DOUBLE-DECK SCISSOR LIFT 

 

 

Inspection Report 

 

 

Name of the commodity

  Double-deck scissor lift 

Model No.

SXJS3018 

This  product  applied  standard  Q/0601KHD002-2010.  Product 

inspection  items  and  results  before  sending  out  of  factory  are  as 

follows

 

 

No

 

Inspection items

 

unit

 

Standard 

Value

 

measured 

value

 

Lifting height

 

mm 

2000 

 

Lifting capacity

 

Kg 

3000 

 

System pressure

 

Mp 

25 

 

Pneumatic 

pressure

 

Mp 

0.4

0.6 

 

Lifting time

 

90 

 

Synchronization 

accuracy without 

load

 

mm 

 

Repeat precision 

mm 

 

synchronization 

accuracy with load

 

mm 

 

 
 

 

 

 

 

 

 

 

 

 

 

 

Inspected by

 

 

 

 

 

 

 

 

 

 

 

 

Date

 

 

 

 

Содержание SXJS3018

Страница 1: ...E DECK SCISSOR LIFT MANUAL Add No 21 Tongrun Road APEC Industrial Zone Zhifu District Yantai China Tel 0535 6853129 Fax 0535 6853815 http www ythaide com Please read this manual carefully before using...

Страница 2: ...rs 4 5 Installation and Adjustment 5 6 Hydraulic System 8 7 Pneumatic system 9 8 Operation 9 9 Maintenance 11 10 Notes 12 11 Common Breakdowns and Solutions 13 12 Qualification Certificate 14 13 Inspe...

Страница 3: ...water filter effectively When the lift works people and equipment should keep a certain distance no standing above and under the equipment and the car on lift can not take any staff The weight of the...

Страница 4: ...oading bearing stress of sling used for handling should be more than 2 ton c Avoid damager or deformation for equipment during handling d Take suitable protective measurements in case of rain or snow...

Страница 5: ...dvantages such as simple structure advanced technology easy operation and safety It is especially suitable for high precision wheel alignment and Auto s repair and maintenance The features as below 1...

Страница 6: ...2 1 Main Technical Parameters 2 2 Dimensional Schematic Diagram Fig 2 Chapter 3 Installation and Adjustment 3 1 Installation Environment The lifts should be installed in the indoor environment without...

Страница 7: ...n The lift with LOGO side toward the outside Refer to Fig 3 Hydraulic system connection diagram to pave the pipe but not connected in the ditch make certain protection to pipe connector 3 4 Infuse hyd...

Страница 8: ...osition to change the motor rotation direction Connected to the gas source according to the pneumatic system connection diagram Fig 4 3 6 Pipe connection Power on click UP button to confirm the oil ou...

Страница 9: ...fall in the same lock tooth Adjust the space around the lifts well Refer to Fig 2 Use a bolt to bore the bolt 14 holes in the ground Put in the bolts but not expanded Use a leveling tool to make sure...

Страница 10: ...ction for too long time the gear pump could be damaged Fig 6 Hydraulic system diagram Chapter 5 Pneumatic System The connection of the pneumatic system refer to Fig 4 The schematic of the pneumatic sy...

Страница 11: ...nd place the platform to the lowest location Then release the descending button 6 5 Drive a vehicle on the lifts Put rubber pads under the vehicle Make sure the lift points is directly to the rubber p...

Страница 12: ...mes of using longest 2 years Release the used oil thoroughly Clean the oil tank and oil filter Fill in enough oil Check the oil level regularly Do not let anything dirt falls in the oil tank in case t...

Страница 13: ...d Do not change the time setting of the time relay 8 7 The lock must be released before repairing or testing The protection lock must be released very well 8 8 If the power off suddenly when the facil...

Страница 14: ...e button 2 The electromagne tic valve doesn t work 3 The control valve Is jammed 1 Check or change the button 2 Check the electromagnetic valve and the relative lines 3 Clean it 6 There is pressure in...

Страница 15: ...is qualified according to the delivery inspection Dimension mm mm mm Product Number Corporate Representative Inspected by Date Yantai Haide Science And Technology Co Ltd Add No 21 Tongrun Road APEC I...

Страница 16: ...ection items and results before sending out of factory are as follows No Inspection items unit Standard Value measured value 1 Lifting height mm 2000 2 Lifting capacity Kg 3000 3 System pressure Mp 25...

Страница 17: ...n Lifting Platform SXJS3018 2 2 Rubber Pad 4 3 Electrical Control Box Assembly 1 4 Pneumatic FRL 1 5 Compound Pad 14 8 6 Expansion Bolt M16 120 8 7 Gasket 16 8 Plastic band 10 9 Inspection Report 1 10...

Страница 18: ...16 SXJS3018 DOUBLE DECK SCISSOR LIFT Figure I Electric Schematic Diagram...

Страница 19: ...17 SXJS3018 DOUBLE DECK SCISSOR LIFT Figure II Foundation Installation Diagram...

Отзывы: