XTT 5000 User's Manual
The top left of the window displays test status:
Elapsed Time
: How long the test has been running.
Remaining Time
: How long remains in the scheduled test, or Continuous.
Banner
: A message summary banner of the status of the test. It reports any errors
or alarms, along with a date and time stamp.
Below the banner, view a list of logged
: received errors and/or alarms, e.g.
Lost Frame, including a count of the number of errors, with a resolution of one
second.
The right side of the window shows more specific results.
Status
Even though the test set generates pings, there are circumstances which cause the
pings not to be sent. For example, the port could lose link or be paused, preventing
the transmission of the Ethernet frames in which the ping packets reside. In these
situations, the number of pings sent will not be displayed to avoid confusion.
Parameter Details
TX
Utilization
Transmitted bandwidth as a percentage of maximum traffic rate
(minimum frame gap)
TX Line
Rate
Transmitted bit rate (in kbps, bps, etc.) of the Ethernet frames,
ignoring the frame gap, preamble, and SAD. The data rate is
always less than the line rate.
TX Data
Rate
Transmit data rate (in kbps, bps, etc.). This includes the frame
headers but not the IPG or Preamble. Thus, the data rate
reflects both the frame rate and frame size.
RX
Utilization
Received bandwidth as a percentage of maximum traffic rate
(minimum frame gap).
RX Line
Rate
Received bit rate, based on the current utilization (in kbps, bps,
etc.).
RX Data
Rate
Received bit rate of the Ethernet frames, ignoring the frame
gap, preamble, and SAD. The data rate is always less than the
line rate (in kbps, bps, etc.).
Press
on the Action Bar to start a test.
Where do you want to go next?
116
Содержание XTT 5000
Страница 1: ...XTT 5000 User s Manual...
Страница 2: ......
Страница 6: ......
Страница 11: ...XTT 5000 System Monitor Applications Monitor Setup Technology Overview Learn about Ethernet technology 5...
Страница 36: ......
Страница 52: ...XTT 5000 User s Manual L1 BERT Diagram Home Layer 1 BERT Applications Where do you want to go next Home 46...
Страница 55: ...Throughput Testing L2 BERT Diagram Home Layer 2 BERT Where do you want to go next Home 49...
Страница 58: ...XTT 5000 User s Manual Throughput Stream Results Throughput Test Setup Working Desktop Home 52...
Страница 61: ...Throughput Testing Home 55...
Страница 67: ...Throughput Testing Throughput Aggregate Results Throughput Stream Results Home 61...
Страница 81: ...Throughput Testing Working Desktop Home 75...
Страница 83: ...Throughput Testing Home 77...
Страница 106: ...XTT 5000 User s Manual Throughput Stream Results Throughput Test Setup Working Desktop Home 100...
Страница 116: ......
Страница 142: ......
Страница 147: ...Save Features 141 RFC2544 NE Applications IP Test Setup Monitor Setup Loopback Test Setup Home...
Страница 148: ......
Страница 172: ......
Страница 181: ...Index 175 X XFP 40 XFP Port Setup 40...