- 6 -
3.2
、
UNLOADING WARNNING
卸货注意事项
3.2.1 Use a suitable lifting fixture to handle, no more
than 2 pallets of modules. Before lifting, check whether
the tray and the carton are damaged and whether the
hoisting ropes are strong and firm. Two people shall
support at the two sides of the righting carton gently to
place it on the relatively flat position of the project site.
使用合理的吊装治具,吊装一次性最多允许2托组件。
吊装前应确认托盘和纸箱是否有破损及吊装的绳索是否
结实、牢固。吊装快着地时,两人一人一边扶正纸箱轻
轻放在项目地相对平坦的位置上。
3.2.2 Use a forklift to remove the module pallets from
the truck
.
请使用叉车将组件从货车上卸下来。
3.2.3 Put the modules on level ground.
将组件放置于水平地面上。
3.2.4 Do not stack the modules at the project site.
禁止在项目地将组件堆码。
3.2.5 Store the module in a dry and ventilated place.
将组件放置在通风干燥处。
3.2.6 Cover the module with waterproof material to
prevent it from moisture.
使用遮雨布盖住组件,防止组件受潮。