适当的安全防护装置(绝缘工具、绝缘手套等)。组件的安装和拆卸请参阅产品安装手册。

Check the electrical, grounding and mechanical connections every 6 months to ensure they are clean and

safe, free from damage or rust. Check that all string fuses in each non/earthed pole are operating. Check that the

mounting parts are tight. Check all cables and make sure that the connectors are securely. PV modules frames

and bracket should be well mechanically connected.

建议每

6

个月检查一次电气、接地和机械连接件,确保其清洁安全,无损坏或生锈;检查每个非接地极中的所

有阵列熔丝是否正常工作;检查安装部件是否已拧紧;检查所有电缆并确保接头牢固拧紧。使用金属边框的光伏组
件,边框和支架应结合良好。

Check whether there is any foreign body on the surface of the PV modules and whether there is any shielding.

Trim any vegetation which may shade the PV array, thus impacting performance.

检查光伏组件表面是否有异物,是否有遮挡。除去一切可能遮蔽光伏方阵从而影响其性能的植被。

When repairing PV modules, cover the surface of PV modules with opaque material to prevent electric shock.

Exposure of PV modules to sunlight will generate high voltages, this is dangerous. Please pay attention to safety

when maintenance and it must be done by professionals.

修理太阳能光伏组件时请用不透明的材料覆盖在太阳能光伏组件表面以防止产生电击。太阳能光伏组件曝露在

阳光下会产生高电压,维修时请注意安全,维修必须有专业人员进行。

Wear cut resistant gloves and other personal protective equipment required for the particular installation.

Isolate the impacted array string to prevent current flow before attempting to remove the module. Disconnect the

connectors of the affected module using the related disconnect tool provided by suppliers. Replace the damaged

module with a new functional module of the same type.

进行特殊安装时需要穿戴防切割手套和其他防护装备。在尝试移除组件之前,一定要将受影响的阵列隔离以防

止电流产生。用供应商提供的相关断开工具去断开受影响组件的连接器。使用相同类型的新组件更换损坏的组件。

In a system using a battery, blocking diodes are typically placed between the battery and the PV module

output to prevent battery discharge at night.

在使用电池的系统中,阻塞二极管通常放置在电池和光伏组件输出装置之间以防止夜间电池放电。

Diodes that are used as blocking diodes must have a:

用作阻塞二极管的二极管必须具备

:

a) Rated Average Forward Current

IF(AV)

above the maximum system current at the highest module

operating temperature.

a)

额定平均正向电流[

IF(AV)

]在模块最高工作温度下高于最大系统电流。

b) Rated Repetitive Peak Reverse Voltage

VRRM

above the maximum system voltage

Vmax

at the

lowest module operating temperature

IEC

Vmax=1500V

;)

b)

模块最低工作温度下额定重复峰值反向电压[

VRRM

]高于最大系统电压[

Vmax

](

IEC

Vmax=1500V

;)

When the irradiance is no less than 200W/m², if the terminal voltage is more than 5% different than the rated

value, it illustrates the connection of the modules is not good.

在辐照度不低于

200W/m

2

的情况下,如果终端的电压与额定值相差

5%

以上,说明组件连接不好。

Comply with maintenance instructions for all modules used in the PV system, such as brackets, charging

rectifiers, inverters, batteries, lightning protection systems, etc.

必须遵守光伏系统使用的所有部件,如支架、充电整流器、逆变器、蓄电池、防雷系统等的维护说明。

Warning:

The warning signs on the PV modules must not be lost. Any electrical maintenance must shut

down the PV system firstly. Improper system maintenance may cause fatal dangers such as electric shock and

burning. Observe the safety precautions listed earlier in this Manual.

警告:光伏组件上的带电警告标识不得丢失。任何电气的维护都必须首先关闭光伏系统,不合适的系统维护可

能导致电击和燃烧等致命的危险。请注意本手册前面列出的安全注意事项。

Содержание SP165-36P SP160-36P

Страница 1: ...ument No SP WI JS 010 SUNPRO PV MODULES INSTALLATION MANUAL YuHuan Sunpro Power Co Ltd Qinggang Technological lnd Zon 317606 Yuhuan Zhejiang Province China Tel 86 576 8073 0906 E mail tech sunpropower...

Страница 2: ...t No SP WI JS 010 DOCUMENT COUNTERSIGN DEPARTMENT Technology Department Quality Department Sales Department COUNTERSIGNER DOCUMENT NO SP WI JS 010 COMPILER EDITION B REVIEWER EFFECTIVE DATE 2020 6 1 A...

Страница 3: ...G 7 3 4 STORAGE 8 3 5 ELECTRICAL RATING 8 4 UNPACKING SAFETY 15 5 INSTALLATION 17 5 1 INSTALLATION SAFETY 17 5 2 ENVIRONMENT CONDITIONS AND SITE SELECTION 19 5 3 TILT ANGLE OF INSTALLATION 21 5 4 INST...

Страница 4: ...our website at https www sunpropower com as these lists are updated on a regular basis https www sunpropower com 2 In the event of any inconsistency among different language versions of this document...

Страница 5: ...ternational electrical standards 2 YuHuan Sunpro Solar recommends that PV module installation is conducted by personnel who have been professionally trained in PV system installation Operation by pers...

Страница 6: ...not use liquid such as water to extinguish the fire 5 Do not install or handle modules when they are wet or during periods of high wind 6 At the installation site take care to keep modules and in part...

Страница 7: ...rsons at the same time 2 2 5 Handling the modules requires two or more people with nonslip gloves and both hands 2 6 Do not lift modules by their wires or junction box 7 Do not handle the modules over...

Страница 8: ...KAGING 3 1 1 Need both hands to handle it carefully 3 1 2 Uninstalled modules must be kept dry not expose to rain or moisture 3 1 3 Modules in carton are fragile which must be handled with care 3 1 4...

Страница 9: ...rong and firm Two people shall support at the two sides of the righting carton gently to place it on the relatively flat position of the project site 2 3 2 2 Use a forklift to remove the module pallet...

Страница 10: ...ng transportation make sure that the package is fixed securely to the shipping platform without movement Do not Stack more than two layers on truck 2 3 3 3 Only one layer stacking is only allowed for...

Страница 11: ...stack more than one pallet high 3 5 ELECTRICAL RATING MODULE TYPE S SP520 144M10 SP525 144M10 SP530 144M10 SP535 144M10 SP540 144M10 Voc with tolerance V 48 94 3 49 11 3 49 26 3 49 42 3 49 58 3 Isc wi...

Страница 12: ...em Voltage V 1500 1500 1500 1500 1500 Maximumover Current Protection Rating A 30 30 30 30 30 Calculated NMOT 42 8 MODULE TYPE S SP445 120M10 SP450 120M10 SP455 120M10 SP460 120M10 SP390 108M10 Voc wit...

Страница 13: ...System Voltage V 1500 1500 1500 1500 1500 Maximumover Current Protection Rating A 20 20 20 20 20 Calculated NMOT 42 8 MODULE TYPE S SP415 144M SP410 144M SP380 120M SP375 120M SP370 120M Voc with tole...

Страница 14: ...m System Voltage V 1500 1500 1500 1500 1500 Maximumover Current Protection Rating A 20 20 20 20 20 Calculated NMOT 42 8 MODULE TYPE S SP340 120MG SP335 120MG SP330 120MG SP325 120MG SP320 120MG Voc wi...

Страница 15: ...em Voltage V 1500 1500 1500 1500 1500 Maximumover Current Protection Rating A 20 20 20 20 20 Calculated NMOT 42 8 MODULE TYPE S SP340 60M SP335 60M SP330 60M SP325 60M SP320 60M Voc with tolerance V 4...

Страница 16: ...Voltage V 1500 1500 1500 1500 1500 Maximumover Current Protection Rating A 20 20 20 20 20 Calculated NMOT 42 8 MODULE TYPE S SP245 48M SP205 36M SP200 36M SP195 36M SP190 36M Voc with tolerance V 31 9...

Страница 17: ...stem Voltage V 1500 1500 1500 1500 1500 Maximumover Current Protection Rating A 20 20 20 20 20 Calculated NMOT 42 8 MODULE TYPE S SP255 54P SP250 54P SP245 54P SP240 54P SP235 48P Voc with tolerance V...

Страница 18: ...oduct ordered the product name subname and serial number of each laminate are clearly marked on the outside of each packing box 2 For unpacking outdoors it is prohibited to operate in rainy conditions...

Страница 19: ...ar protective gloves during unpacking to avoid hand injury and fingerprints on the glass surface 6 Each module shall be handled by two persons It is forbidden to pull the wires or junction boxes and f...

Страница 20: ...hoes with rubber soles 3 Make sure flammable gasses are not generated or present near the installation site 4 Do not install modules under rain snow or windy conditions Place disassembled PV modules c...

Страница 21: ...support with bolts 14 Do not drill holes in the frame It may cause corrosion of the frame or PV modules burst 15 Do not damage the surrounding PV modules or mounting structure when replacing a PV modu...

Страница 22: ...ll be immersed in or continually exposed to water 5 2 ENVIRONMENT CONDITIONS AND SITE SELECTION YuHuan Sunpro Solar module should be installed in the following environmental conditions Table 5 1 opera...

Страница 23: ...e the shadow factor Position the modules to minimize the chances of shading at all times of the day Try to install modules in a location where there is rare shading throughout the year Shading can nor...

Страница 24: ...ch is caused by different light absorption of different Solar modules this mismatch will cause the PV system power output loss When all solar modules are mounted in the same plane and orientation then...

Страница 25: ...an 10 degrees are not covered by manufacturer s warranty It is roughly equal to the latitude of the project site as a rule of thumb facing toward the equator Optimized system designs must incorporate...

Страница 26: ...ctivity the module installation height to the ground the array spacing and the shadow shading to the module backside Generally speaking the reflectance is various with the different ground See table 5...

Страница 27: ...beneath the modules If modules are mounted without continuous rails below them the maximum allowable loading will be reduced and needs to be subjected to review by YuHuan Sunpro Please ensure that th...

Страница 28: ...from the module clamps The module frame is not to be modified under any circumstances When choosing this type of clamp mounting method use at least four clamps on each module two clamps should be att...

Страница 29: ...dard installation mode and the specific information shall be consulted by YuHuan Sunpro Power Solar A 1 5L 50mm L Module width 1 The crossbeam is perpendicular to the short side frame 2 The above desc...

Страница 30: ...al direction 2 Fig 3 Split J Box at module middle position for horizontal direction 3 Precautions To minimize risk in the event of an indirect lightning strike avoid forming loops when designing the s...

Страница 31: ...connected in series Modules connected in series should ensure the consistency of their current The voltage of the module string should not exceed the allowable system voltage value which can be found...

Страница 32: ...Connect the quantity of modules that match the voltage specifications of the devices used in the system The modules must not be connected together to create a voltage that is higher than the permitte...

Страница 33: ...and require very little day to day supervision The solar array generates DC electricity whenever light falls on it similarly the inverter automatically turns ON as soon as there is sufficient energy f...

Страница 34: ...on devices which are complied with local laws and electrical regulations All the above instructions must be followed to meet YuHuan Sunpro Solar warranty conditions 3 Bypass secondary If PV module par...

Страница 35: ...arallel module configurations fuse rating Isc Isc 5 Grounding All PV module frames and mounting brackets must be properly grounded in accordance with the applicable national electrical code Correct gr...

Страница 36: ...nding hole you can also choose the following grounding ways 1 Grounding by unused mounting holes 2 Other professional grounding devices The electrical contact points of all the above grounding methods...

Страница 37: ...installed PV modules need to be inspected and maintained regularly The inspection and maintenance of modules in the PV array shall be carried out by personnel who have received professional PV system...

Страница 38: ...e connectors of the affected module using the related disconnect tool provided by suppliers Replace the damaged module with a new functional module of the same type In a system using a battery blockin...

Страница 39: ...withstand DC voltages of no less than 2000V 2000V Use dry or wet soft cloths sponges etc to clean the modules during the cleaning process but do not put any modules directly into the water do not use...