FOLDING INSTRUCTIONS
FOLDING THE TREADMILL
UNFOLDING THE TREADMILL
Place your hand at the end
of the running deck [
position
A
] and lift up the
Main
Frame
(No. A02)
until the
Air Pressure Cylinder (No.
B03)
locks [
position B
].
NOTE:
You will hear a click
when the
Air Pressure
Cylinder
(No.
B03)
is
successfully locked in.
Grasp the
Main Frame
(No.
A02)
with one hand [
position
A
] and use your foot to
lightly kick the
Air Pressure
Cylinder
(No.
B03)
to
unlock [
position B
]. Give the
Main Frame (No. A02)
a
downward
push
from
position A
and the running
deck should automatically
continue to steadily lower
itself until the
Main Frame
(No. A02)
reaches level
ground.
NOTE:
Before lowering the
main frame, ensure that the
space directly underneath it
is clear of any objects.
10
Содержание SF-T7513
Страница 4: ...EXPLODED DRAWING 3...