- 7 -
GD-1000 UL( US specification)
parallel connection
Installation of heater
panel(B1, B2) in the
under dome
Heater panel B1 ( long cord )
Heater panel B2 (short cord )
GD-1000 UL( US specification)
parallel connection
- 8 -
Installation of heater
panel C in the under
dome
Base board of under dome
Heater panel C
Pressed board of under dome
Содержание GD-1000
Страница 1: ...GD 900 GD 1000 Troubleshooting Guide ...
Страница 10: ...GD 900 GD 1000 Structure Diagrams 15 ...
Страница 11: ...16 ...
Страница 12: ...17 ...
Страница 13: ...18 ...
Страница 14: ...19 ...
Страница 15: ...20 ...
Страница 16: ...21 ...
Страница 17: ...22 ...
Страница 18: ...23 ...
Страница 19: ......