background image

23

Содержание GD-1000

Страница 1: ...GD 900 GD 1000 Troubleshooting Guide ...

Страница 2: ...fication parallel connection 5 9 GD 1000 CE European specification series connection 10 GD 1000 Heater Panel and Troubleshooting 11 GD 1000 Control Box Circuit Board UL US specification 12 GD 1000 Control Box Circuit Board CE European specification 13 GD 1000 Control Box Fuse and Troubleshooting 14 GD 900 GD 1000 Structure Diagrams 15 23 2006 04 20 ...

Страница 3: ...iddle or high temperature the longest it can show is 1 hour Red light high temperature which is section 8 9 Yellow light mid temperature which is section 5 7 Green light low temperature which is section 1 4 Temperature display section 1 9 Power On Off Temperature control Timer control Front panel Switch mode of time display from hours to minutes Notice 1 Fragile device do not break 2 Be cautious t...

Страница 4: ...ction to power Connection to heater panel Fuse build in Defect the pad would not heat up New type Timer display 1 Under low temperature the longest it can show is 12 hours 2 Under middle or high temperature the longest it can show is 1 hour Red light high temperature which is section 8 9 Yellow light mid temperature which is section 5 7 Green light low temperature which is section 1 4 Temperature ...

Страница 5: ... long cord A2 Heater panel short cord 6 Power cord in the upper dome 1 Parallel connecting of heater panel A1 and A2s power cords red 2 Series connecting of heater panel A1 and A2s power cords white A1 red power cord GD 1000 UL US specification series connection A2 red power cord A1 white power cord A2 white power cord ...

Страница 6: ...on of heater panel B1 B2 in the under dome Heater panel B1 long cord Heater panel B2 short cord GD 1000 UL US specification parallel connection 8 Installation of heater panel C in the under dome Base board of under dome Heater panel C Pressed board of under dome ...

Страница 7: ...r and lower dome under CE European specification for GD 1000 Power cords in the under dome 1 Series connecting of heater panel A1 and A2 2 Weld the other end of power cords of heater panel A1 and A2 on the outlet 1 Series connecting of heater panel B1 and B2s power cords 2 Parallel connecting of heater panel B1 and Cs power cords 3 Parallel connecting of heater panel B2 and Cs power cords B1 red po...

Страница 8: ...s brunt off or not 2 If the temperature switch is well conducted 3 If there is a broken of any welding point 4 Accurate welding point on the outlet and wiring on upper and under dome as figures attached 12 GD 1000 Control Box Circuit Board UL US specification J2 power cord black and white output for under dome Power cords black white and green Input Voltage 110V Provide power for upper and under dom...

Страница 9: ...ct 3 If there is a malfunction of transformer 4 If there is a malfunction of relay If the fuse is broken or any defect occurs 1 The light will not function 2 Domes will not heat up or work UL specification 10 A 250V CE specification 6 3 A 250 V J2 power cord blue and brown output for under dome Transformer Red and white cords connect to the fuse J1 power cord blue and brown output for upper dome Con...

Страница 10: ...GD 900 GD 1000 Structure Diagrams 15 ...

Страница 11: ...16 ...

Страница 12: ...17 ...

Страница 13: ...18 ...

Страница 14: ...19 ...

Страница 15: ...20 ...

Страница 16: ...21 ...

Страница 17: ...22 ...

Страница 18: ...23 ...

Страница 19: ......

Отзывы: