background image

 

© 2019 Sunman (Zhenjiang) Co., Ltd. All rights reserved. Specifications included in this manual are subject to change without notice. 

www.sunman-energy.com 

version 2019A      page 15 / 18 

TM 

 

Excessive cables must be organized or fixed in an adequate way, e.g. attached to the mounting structure 

by using non-metallic cable ties. 

 

For applications requiring high operating voltage several eArc can be connected in series to form a string 

of eArc; the system voltage is then equal to the sum of the voltage of each eArc. 

 

For applications requiring high operating currents several strings of eArc can be connected in parallel; 

the system current is then equal to the sum of the current of each string of eArc. 

 

The maximum system voltage is 1000 volts DC. 

 

The maximum number of series connected eArc depends on system design, the type of inverter used 

and environmental conditions. 

 

Please make sure no more than two strings in parallel if eArc without any fuse or blocking diode to be 

connected according to the maximum series fuse rating of eArc and local electrical installation code.   

 

There is no limitation on the number of  eArc that can be connected in parallel (fuse for each string 

should be considered), the number of eArc is determined by system design parameters such as current 

or power output. 

 

To prevent the cables and the connectors from overheating, the cross section of the cables and the 

capacity of  the  connectors  must be  selected to suit  the  maximum  system  short  circuit  current. The 

recommended cable is PV wire (temperature rating is 90

) with a cross section of at least 2.5mm². 

 

Please refer to local regulations to determine the system wires size, type and temperature. 

 

eArc are supplied with connectors to be used for system electrical connections. Please refer to the local 

regulations and the datasheets for which connectors are allowed to be used. 

 

To ensure reliable electric connection and to prevent possible intrusion of humidity, connectors must 

be mated and locked together until a click can be heard. 

 

Long-term exposure to wet environments may cause connectors’ poor connectivity, resulting in current 

leakage  and  poor  conductivity.  SUNMAN  recommend  proper  connector/cable/wire  management  to 

prevent  moisture  intrusion.  Depending  on  the  amount  of  humidity,  SUNMAN recommends periodic 

inspections of the installation system to maintain optimal eArc’ performance.   

 

The DC current generated by photovoltaic systems can be converted into AC and fed into a public Grid. 

As  local  utilities’ policies  on  connecting  renewable  energy  systems  to  the  Grids  vary  from  region  to 

region.  Always  seek  the  advice  from  a  qualified  system  designer  or  integrator.  Building  permits, 

inspections and approvals by the local utility are to be expected.   

 

Disclaimer of liability 

 

As  the  adherence  to  this  manual  and  the  conditions  or  methods  of  installation,  operation,  use  and 

maintenance of photovoltaic (PV) products are beyond SUNMAN’s control, SUNMAN does not accept 

responsibility and expressly disclaims liability for any loss, damage, or expense arising out of or in any 

way connected with such installation, operation, use or maintenance. 

Содержание eArc SMA160M-4X09DW

Страница 1: ...eArc PV System Installation Manual...

Страница 2: ...his guide Features Benefits Notices General safety Handling safety Installation safety Fire safety Production Identification Mechanical Installation Grounding Electrical installation Disclaimer of lia...

Страница 3: ...tion For any questions please contact SUNMAN s Customer Service Department or our local representatives for more detailed information Installers should follow all safety precautions described in this...

Страница 4: ...w sunman energy com version 2019A page 2 18 TM Features Benefits Flexible layouts eArcTM PV system can be installed at any shape roofs which has integrated appearance with buildings Maximization insta...

Страница 5: ...s required for eArcTM PV System PV arrays Copyright and Trademark Information Copyright 2019 by Sunman Zhenjiang Company Limited All rights reserved eArc and the SUNMAN logo are trademarks of Sunman Z...

Страница 6: ...d mounted mounted on rooftops vehicles or boats The proper design of support structures lies within the responsibility of the system designers and installers Do not use mirrors or other magnifiers to...

Страница 7: ...nections or unplug connectors while the circuit is under load Contact with electrically charged parts of the panels such as terminals can result in burns sparks and lethal shock whether or not the pan...

Страница 8: ...ated current rated voltage open circuit voltage short circuit current all as measured under standard test conditions weight dimensions etc the maximum system voltage is 1000 volts Barcode each individ...

Страница 9: ...ing eArc with a tilt angle of at least 10 degrees making it easier for dust to be washed off by rain Always keep the back sheet of the panel free from foreign objects plants and vegetation or structur...

Страница 10: ...steel roof sheeting Any other roof sheeting requires consolation with Sunman or its local importer b Size of color steel roofing c Preparation of bonding material Prepare silicone nozzle by cutting a...

Страница 11: ...n to clean cloth Wiping down the roof apply to the adhesion area Reapply until clean Leave to dry e Install chemical bonding material Apply the silicon with the nozzle perpendicular to the roof The le...

Страница 12: ...manual are subject to change without notice www sunman energy com version 2019A page 10 18 TM f Layout of SMD Series Layout For SMD Series SMDxxxM 6X12DW SMDxxxM 6X12UW SMDxxxM 6X10DW SMDxxxM 6X10UW...

Страница 13: ...o not install using quick bonding method when rain is present Do not install using quick bonding method when wind speeds greater than 10m s are present at the site within 24 hours Roof and ambient tem...

Страница 14: ...be properly secured to their supports so that they can withstand the pressure of the load including the rise and pressure of the wind It is the responsibility of the installer to ensure that the moun...

Страница 15: ...always grounded SUNMAN recommends always refer to local state and national code requirements for PV module grounding SUNMAN highly recommends negative grounding if it s allowed by local authorities W...

Страница 16: ...ding is achieved by bonding all conductors on the module frame and metal mounting structures continuously with a suitable grounding conductor Third party grounding solutions are acceptable These solut...

Страница 17: ...ort circuit current The recommended cable is PV wire temperature rating is 90 with a cross section of at least 2 5mm Please refer to local regulations to determine the system wires size type and tempe...

Страница 18: ...1 9 52 1662mm X 1019mm X 5 6mm 5 5kg 20A 20 SMD290M 6X10DW 290 32 6 8 90 39 9 9 43 1662mm X 1019mm X 5 6mm 5 5kg SMD285M 6X10DW 285 32 4 8 80 39 7 9 34 1662mm X 1019mm X 5 6mm 5 5kg SMD280M 6X10DW 280...

Страница 19: ...m X 995mm X 35mm 7 6kg 20A 20 SMA290M 6X10DW 290 32 6 8 90 39 9 9 43 1638mm X 995mm X 35mm 7 6kg SMA285M 6X10DW 285 32 4 8 80 39 7 9 34 1638mm X 995mm X 35mm 7 6kg SMA280M 6X10DW 280 32 2 8 70 39 5 9...

Страница 20: ...X 665mm X 35mm 6 4kg SMA225M 4X12UW 225 25 5 8 83 31 3 9 36 1983mm X 665mm X 35mm 6 4kg SMA220M 4X12UW 220 25 2 8 74 31 1 9 27 1983mm X 665mm X 35mm 6 4kg SMA215M 4X12UW 215 24 9 8 64 30 9 9 18 1983mm...

Страница 21: ......

Страница 22: ......

Отзывы: