Li.ONESS Batteries
| Operation, Safety and Installation Manual
16
• Insert the Power Unit (P.U.) or PBT Unit (where
applicable) at the final set of sliding rails as shown
below
• After the installation of all the modules and Power /
PBT unit the system layout is shown below
• Screw the M5x12mm bolts using SW10 hexagonal
screwdriver
Picture 21a
Li.ONESS P.U. installation
Picture 22
Li.ONESS System installed at battery
cabinet
Picture 23
Li.ONESS modules tighten on vertical
U-rail
Picture 21b
Li.ONESS P.U. installation
EN