Hardware Pack 4
Fig.16:
Attach the assembled small top on the tube of oblique beam (G1) through small top oblique
beam (L).
Fig.17-1:
Cover the big canopy (P) on the big top, then button up canopy on the oblique beam
down tube (G2).
Fig.17-2:
Cover the four cloth buttons which in the middle of big canopy (P) on the middle beam
down tube (H2).
CC
M6*15 Hex bolt
28PCS
BB
M6 Washer
28 PCS
HH
M6 antiskid nut
2 PCS
FF
∮
8*180 Stake
16PCS
GG
M6*90 Flat bolt
2pcs