5
/
8
Country of Origin: China
Fig.7: Insert
Middle Beam
(
long/short
)
(I/J) to
big top connector(L).
Fig.9: Insert
Slant Beam
For Small Roof(M) to Small
top connector
(
N
)
.
Fig.6: Insert
Pipe under slant beam(F) to
screen(A).
Fig.8:
Attach Middle Beam
(
long/short
)
(I/J) to Long Beam
(
D
)
and short Beam (E) by using
bolt (CC),washer (BB) and nut
Fig.10‐1
、
Fig.10‐2:Install the adjusting
pipe(T) to the
lower endof the big top
middle beam (I&J) and the small top
inclined beam (M)of the
Pipe under
slant beam
(M),and close it to the
minimum.
Fig.11‐1
、
Fig.11‐2:Place the small top
cloth(Q) on the four corners of
thetop,then adjust the position of
the adjusting pipe until the small top
cloth is tight
.