6
/
10
Country of Origin: China
Fig.4:
Attach short beam (F1/F2)to long beam(E1/E2) by using bolt
(
CC
)
, washer (BB).
Fig.5:
Insert
Decorative tube(G) to long beam
(
E1/E2
)
by using
bolt
(
CC
)
, washer (BB).
Fig.6:
Attach Netting bar
(
H
)
to beam
(
F1/F2/E1/E2
)
by using bolt
(
CC
)
, washer (BB).
Fig.7:
Insert Pipe under for middle beam
(
I
)
to beam
(
F2/E2
)
.
Fig.8:
Attach Pipe under for slant beam
(
J
)
to beam
(
F1/F2/E1/E2
)
by using bolt
(
CC
)
, washer (BB).
Fig.9:
Attach Support triangle
(
L
)
to Post
(
K
)
by using bolt
(
DD
)
, washer (BB).