Sungrow SC50HV Скачать руководство пользователя страница 7

 

 

 

No. 

Name 

Description 

Configuration 

circuit 

board 

Communication 

cable 

connection 

and 

configuration 

Battery crimping terminal 

Battery input cable access 

AC crimping terminal 

AC output cable access 

PE terminals 

PE cable access 

AC switch 

Protective  components  to  safely  disconnect 
from AC side. 

Communication 

cable 

glands 

For Communication cable connection 
Knockout diameter for COM cable is 28.5mm 

Battery cable gland 

For battery cables connection 
Knockout diameter for BAT cable is 75.5mm 

10 

AC cable gland 

For AC cables connection 
Knockout diameter for AC cable is 75.5mm 

11 

PE cable gland 

For PE cable connection 

 

3-2 Cables Selection 

 

Second PE Cable 

The cross-sectional area of the  second PE cable shall be exactly the same 

with that of the PE cable of the AC cable. 

 

AC Cable 

The cross-section of the AC cable conductor must be sized in order to prevent 
accidental  disconnections  of  the  PCS  from  the  grid  due  to  high  impedance  of 
the cable that connects the PCS to the power supply point. 

A

B

L1

L2

L3

C

D

 

No. 

Description 

Remark 

Protective layer /Conduit 

Outer 

diameter: 

22mm~33mm 

0.87in~1.30in 

Length  of  insulation  to  be 
stripped off 

Refer to Fig. 3-1Crimping the lugs 

Insulation layer 

Cross  section  of  AC 
cables 

Range: 25mm

2

-120 mm

2

 / 4AWG~4/0AWG 

 

Internal PE Cables 

Outer diameter 

Cross section 

5mm~10mm / 0.20in~0.40in 

6 mm

2

–16 mm

2

 / 10AWG~6AWG 

Содержание SC50HV

Страница 1: ...al can be downloaded by visiting the website at http support sungrowpower com or it can be obtained by scanning the QR code on the side of the equipment or the back cover of the Quick Guidance Any vio...

Страница 2: ...Backplate It is used for mounting PCS onto the wall C Documents Documents include quality certificate packing list product test report and quick user manual D Fastener set Six units It is used for fas...

Страница 3: ...wall materials material Flammable wall Flammable material or gas near theinstallation Requirement for installation height Ground Requirement for installation angle Requirement for installation space T...

Страница 4: ...s following procedures Step 1Remove the backplate and fasteners from the packaging Step 2Place the backplate to the chosen metal frame and adjust it to proper position and height Step 3Mark the positi...

Страница 5: ...make sure they match perfectly Step 2After putting the converter on the backplate secure the converter to the backplate with two M4 16 screws fix screw hole has its own nut Mount the PCS No Name Descr...

Страница 6: ...tions have completed 3 1 Open the Connection Cabinet Loose the six screws on the front cover of the connection cabinet and remove the front cover to see the internal layout of the connection cabinet 2...

Страница 7: ...75 5mm 11 PE cable gland For PE cable connection 3 2 Cables Selection Second PE Cable The cross sectional area of the second PE cable shall be exactly the same with that of the PE cable of the AC cabl...

Страница 8: ...ct between the AC copper bar and the aluminum cable Aluminum cable Conversion terminal Directly connecting the aluminum cable to the copper bar will cause abnormal operation or even device damage 3 4...

Страница 9: ...circuit breaker recommended specification 125A 690V between the PCS and the AC side Step 1Disconnect AC circuit breaker to prevent it from inadvertently reconnecting Step 2Loosen the six screws M6 16...

Страница 10: ...rresponding terminals L1 L2 L3 M10 34 40 N m Pictures here are indicatively only Product in kind prevail Please avoid squeezing the cable insulation layer into the AC terminal Improper connection may...

Страница 11: ...2 1 Heat shrink tubing 2 Cord end terminal Step 2Loosen the swivel nut of the gland terminal Marked as PE cable and select an appropriate seal according to cable outer diameter Lead the cable through...

Страница 12: ...and tighten it with the proper tool Step 4Install the heat shrinkable tubing shrink the tubing with hot air blower Step 5Loosen the swivel nut of the gland terminal Marked as BAT Input and select an...

Страница 13: ...ture and ensure long term and normal operation of the PCS 3 8 Communication Connection Step 1Thread the Network cable through communication cable gland to the configuration circuit board Step 2Strip o...

Страница 14: ...revent the entry of foreign bodies or moisture and ensure long term and normal operation of the PCS Step 6Connect the communication devices Refer to other manuals and documents if there are other devi...

Страница 15: ...App to establish the communication connection with the PCS through Bluetooth to set the initial parameters When the device is initialized send start instructions via the App For details please refer...

Отзывы: