http://www.sunflower
‐
solar.com/
Version
11.03
10
Subjec
t to c
hange 2011 SUNF
LOWER SOLAR
6. Move the Ornament ring to cling to Water tank. So one of the SFVA is installed.
Fig 3.8
7. With the step above, install the other SFVA tubes. Then all the tubes are installed.
Fig 3.9
Fig 3.9 Spec : After inserting the tubes, you can rotate the water tank slightly, make sure the tubes are in the
middle of the hole center. Thus, you can screw down all the bolts, connect the pipeline, (add the assistant
tank if you have bought it), exhaust the lengthen tube, clean the valve, until now we have already finished
the installation. When the water through the tank, if it don’t leak, means your customer can start to use.
Содержание SFD-SS Series
Страница 1: ...For our present For their future...