![Sundstrom H06-6012 Скачать руководство пользователя страница 5](http://html1.mh-extra.com/html/sundstrom/h06-6012/h06-6012_operating-instruction_1395631005.webp)
2. Performance check, minimum flow
2019-10-23
OI06H-6018 SR 540 EX
5
2.1
Check that the fan unit is
complete, correctly mounted,
thoroughly cleaned and
undamaged.
Connect the hose from the
face shield to the fan unit and
turn it about 1/8 of a turn
clockwise.
2.2
Turn the flow meter bag
inside out and the flow meter
appears.
2.3
Place the face shield in
the flow meter bag and start
the fan.
Grip the lower part of the bag
in order to seal around the
hose.
Grip around the measuring
tube and hold the tube
vertical.
The ball should now float
level with or just over the 175
l/min marking.
If the minimum flow is not
achieved, check that:
-The flow meter is vertical
-The ball moves freely
-The bag seals well around
the hose