![Sundstrom H06-6012 Скачать руководство пользователя страница 15](http://html1.mh-extra.com/html/sundstrom/h06-6012/h06-6012_operating-instruction_1395631015.webp)
9. Maintenance schedule
2019-10-23
OI06H-6018 SR 540 EX
15
The schedule represents the recommended minimum
requirement for maintenance routines in order to ensure that
the equipment will always be in functional condition.
Always use genuine Sundström parts. Do not modify the
equipment. The use of non-genuine parts or modification of
the equipment may reduce the protective function and put at
risk the approvals received by the product.
Before use
After use
Annually
Visual inspection
•
•
•
Performance check
•
•
Cleaning
•
•
Change of O-ring
for breathing hose
Change of gasket for
breathing hose
•
Change of exhalation
membrane
•