SB--7--621
Page 11
BLOWER STARTUP CHECKLIST
This startup procedure should be followed during the initial installation and after any shutdown periods or after the
blower has been worked on or moved to a new location. It is suggested that the steps be followed in sequence
and checked off (
) in the boxes provided.
V
1.
Check the unit and all piping for foreign material and clean if required.
V
2.
Check the flatness of the feet and the alignment of the drive. Feet that are bolted down in a bind
can cause case distortion and internal rubbing. Misaligned V-drives can cause the impellers to rub
against the headplates and cause a reduction in the volumetric efficiency of the unit. Misaligned
couplings can ruin bearings.
V
3.
If blower is V--belt driven, check the belt tension and alignment. Over-tensioned belts create heavy
bearing loads which leads to premature failure.
V
4.
Be sure adequate drive guards are in place to protect the operator from severe personal injury from
incidental contact.
V
5.
Check the unit for proper lubrication. Proper oil level cannot be overemphasized. Too little oil will
ruin bearings and gears. Too much oil will cause overheating and can ruin gears and cause other
damage. Insure drive end bearings are greased.
V
6.
With motor locked out, turn the drive shaft by hand to be certain the impellers do not bind.
V
7.
“Jog” the unit with the motor a few times to check rotation and to be certain it turns freely and
smoothly.
V
8.
The internal surfaces of all Sutorbilt units are mist sprayed with a rust preventive to protect the
machine during the shipping and installation period. This film should be removed prior to start--up.
V
9.
Start the unit and operate 15 minutes at no load. During this time, check for hot spots and other
indications of interference.
V
10.
Apply the load and observe the operation of the unit for one hour. Check frequently during the first
day of operation.
V
11.
If malfunctions occur, do not continue to operate. Problems such as knocking impellers can cause
serious damage if the unit is operated without correction.
Содержание Gardner Denver Sutorbilt Legend GAA P Series
Страница 33: ...SB 7 621 Page 25 SECTION 8 PARTS LIST 300GAA810 B Ref Drawing ...
Страница 35: ...SB 7 621 Page 27 200GAB810 D Ref Drawing ...
Страница 37: ...SB 7 621 Page 29 300GAC810 A Ref Drawing ...
Страница 39: ...SB 7 621 Page 31 300GAC810 A Ref Drawing ...
Страница 42: ...Sunco Powder Systems Inc Blower Division Phone 704 545 3922 www suncoblowers com ...