strona: 11 / 14
3.8.5. Screw the front profile to trolley; check operation of awnings
CAUTION!
For correct operation of the awning, it is necessary that the side profiles are perfectly
parallel to each other, and the connection between the front profile and trolley are
sliding on one side as described below. Otherwise, it may result in incorrect operation
of the awning and damage.
●
Unroll the fabric so that front profile
(E)
is a bit over the transverse profile
(H)
.
●
Screw brackets of the front profile to the cubes in the front profil
(E)
on both sides of the awning.
●
Brackets of the Front profile are so constructed to be screwed durable to a side profile of the awning,
and can move to the other side of the profile through a Teflon inserts. It is necessary for the smooth
operation of the awning! Be careful to tightening the screws so by over tightening not eliminate that sliding
connection. By over-tightening you can eliminate this connection.
●
Roll up the awning, set the end position of the drive and check the operation of the awning.
For the depth of more than 3.5 m perform additional measures:
For the depth more than 3.5 m was used an intermediate support for the awning fabric.
Intermediate support
(EX)
with screws
(PX)
attach to the trolley
(OX)
(Fig.4-7).