![Sun System RS 1850 LED Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/sun-system/rs-1850-led/rs-1850-led_installation-and-operating-instructions-manual_1393219007.webp)
7
9.
CONTROLLING WITH GAVITA MASTER CONTROLLER GEN 2:
Part No.:
HGC906121
DESCRIPTION:
Gavita
®
Master Controller EL2 - Gen 2
I. Remove the cable gland assembly on the LED fixture.
II. Remove the dummy plug from the RJ45 “IN” port.
(Save for future use.)
III. Refer to section 9.3 for instructions on attaching the watertight cable gland to the input cable on the first fixture of the continuous chain.
IV. For instructions on connecting LED fixtures in parallel or series, refer to section 9.1 on daisy chaining with interconnect cables.
9.1
CONTROLLING UP TO 1,000 FIXTURES
I. Remove the dummy plug from the RJ45 “IN” port on all LED fixtures.
II. Use the controller cable (RJ45 - RJ9) to connect the primary channel of the controller to the RJ45 “IN” port of the first LED controller.
III. Use the interconnect cable (RJ45 - RJ45) to connect the RJ45 “OUT” port of the first LED fixture to the RJ45 “IN” port of the second LED fixture.
IV. Repeat these steps to connect up to 1,000 LED fixtures in series.
Warning!
Power cord and interconnect cables must not touch the LED rails.
Avertissement!
Le cordon d’alimentation et les câbles de liaison ne doivent pas toucher aux traverses du dispositif à DEL.
9.2
UTILIZING A 3RD PARTY CONTROLLER
*
I. Follow the sample steps in section 8.3
(Editor Note: EL2 Controller Section)
II. For configuration of interconnect cables, see section 9.4.
(Editor Note: Custom Cables Section)
*This fixture is intended to be used with the Gavita e-Series controller platform. Compatibility with third party controllers is not guaranteed.
9.3
DAISY CHAINING - WATERTIGHT INTERCONNECTIONS
I. Remove the protective cable gland from the RJ45 “IN” port (fig. 7).
II. Remove dummy plug from RJ45 “IN” port (fig. 8).
III. Undo the rear nut of the protective cable gland and pull out the rubber seal (fig. 9).
IV. Slide cable through the securing nut and the gland covering (fig. 10).
V. Plug the interconnect cable into the RJ45 “IN” port (fig. 11).
VI. Place the rubber seal on the wire between the securing nut and gland covering, then press into the protective gland (fig. 12).
VII. Tighten the securing nut onto the gland cover to create a watertight seal (fig. 13-14).
VIII. Repeat steps above for all IO ports in the daisy chain.
fig.7
fig.11
fig.8
fig.12
fig.10
fig.14
fig.9
fig.13
Содержание RS 1850 LED
Страница 10: ...10 PLANNING...
Страница 11: ...11 NOTES...