background image

23

TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL

TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL

Ltd. in the region. 

For  this  purpose  the  claimant  shall  fill 

out  a  claim  form;  the  latter  shall  be 

accompanied  by  the  document  proving 

the  purchase  of  the  collector  (invoice) 

with the date of purchase in it.

10.3.2.

  After  receiving  the  claim  form, 

NES Ltd. considers it and makes decision 

whether the claim has grounds or not, and 

whether the defect is within the scope of 

the  warranty  set  forth  in  this  certificate 

for limited warranty; after which informs 

the customer as to its decision.

10.3.3.

  The  return  of  a  product  cannot 

be  done  without  written  authorization 

issued by the Claim Department.

10.3.4.

  If  on  customer’s  request,  and 

when  there  is  reason  for  urgency, 

the  customer  demands  immediate 

replacement  of  the  product  he  has 

claimed warranty for, before receiving the 

decision as to the claim, said request shall 

be accompanied by a Purchase requisition 

from  the  Commercial  Department.  After 

decision for satisfaction of the claim has 

been  made,  the  Purchase  requisition 

mentioned  above  will  be  annulled  by 

issuing a receipt for returned goods; with 

this  receipt  the  customer  can  purchase 

another  product  with  the  same  price  in 

case the claim has proved grounded.

11. TECHNICAL FEATURES

11.1. 

Technical features of PK type flat-plate collector

 

1. Aluminum casing
2. Silicon seal
3. Protective solar glass
4. Absorber with selective coating 

(PK Select)
Or  with  black  solar  coating  (PK 

Standard)
5. High efficiency insulation
6. Bottom of the collector
7. Absorber pipe harp
8. Inlet/Outlet sleeve
9. Corner protector
10.  Connection  thread  R  ½”

 

(CL 

model)
11. Connection „New Line“ Cu ø 22

 

(NL CL model)

Diagram 29. Elements of PK type flat-plate collector

Содержание PK 2.0

Страница 1: ...TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL model serial number SUNSYSTEM solar collectors FLAT PLATE COLLECTOR series EVACUATED TUBE COLLECTOR VTC series v0 1...

Страница 2: ...t transfer plates 6 4 Transportation of the collector 6 5 Delivery of the collector 6 6 Installation 8 6 1 Installation of flat plate collector 9 6 2 Installation of evacuated tube collector VTC 10 6...

Страница 3: ...uring installation and operation the country specific requirements and regulations must be observed local construction regulations on installation on building mass of the system to comply with the bui...

Страница 4: ...port the heating system only in the manner described in this manual Installation and maintenance must be performed by a technician service shop authorized for such operations 2 DESCRIPTION OF PK TYPE...

Страница 5: ...y has the necessary constructive strength to withstand the year round whims of weather not sacrificing on light weight 3 DESCRIPTION OF VTC TYPE EVACUATED TUBE COLLECTOR 3 1 Evacuated tube Absorber co...

Страница 6: ...e use of pallet jack fork truck or other hoisting devices is a must Transportation of Flat plate collectors PK Protective plastic corners are fit on each panel collector frame to protect it from rubbi...

Страница 7: ...ectors before connecting collectors to system Before installing PK type collectors remove the protective plastic cor ners from collector frames Do not take out or expose the tubes to sunlight during i...

Страница 8: ...n be installed in places where the values for wind load Vm mean wind speed does not exceed 150 km h and snow loads Sk weight of snow mass does not exceed 1 25 kN m according to ENV 1991 1 3 and 1991 1...

Страница 9: ...Adjust the support angle as needed Place the collector on the support Fix the collector to support using the clamping clips Make sure all connections are properly secured and will not loosen under ha...

Страница 10: ...slopes Diagram 14 6 2 1 Flat roof VTC type collector installation Diagram 15 Installation is carried out by at least two people We recommend consulting with a roofing expert Fix the support onto the...

Страница 11: ...e the bar rests on the roof tile Install the two side rails F to fixing straps B Use the screws and therefore provided orifices in the rails Diagram 17 Step 3 At the bottom of both side rails F insert...

Страница 12: ...box The upper end of the tube with a silver probe like tip as must fit in the manifold nest The lower end of the tube must pass through tube holder D Place the plastic protector on the bottom of tube...

Страница 13: ...service shop for such operations Our warranty does not cover dam age from extremely strong acts of nature We recommend that dam age of collectors be included as a clause in your building insurance Co...

Страница 14: ...ary in the summer period In this case we recommend that the system be fitted with a device for heat dissipation or to add more users to the hot water circuit in the summer swimming pool or other simil...

Страница 15: ...o increase in temperature until the limit of the temperaure relief valve is reached at which point hot water will be dumped from the system If a PTRV is not installed on the collector steam will form...

Страница 16: ...ed to operate at a pressure of 500 kPa achieved by use of a pressure limiting reduction value For the reliable operation of system we recommend you check the lever of the pressure and temperature retu...

Страница 17: ...d OPERATION MANUAL 7 8 Connection diagrams Diagram 25 Connection of Flat plate collector K to solid fuel boiler WBS combi tank KSC2 and three way valve Must be performed by an autho rized service tech...

Страница 18: ...SSPORT INSTALLATION and OPERATION MANUAL TE TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL TE Diagram 26 Connection of Evacuated tube collector VTC to solid fuel boiler WBS combi tank KSC2 and t...

Страница 19: ...19 AL TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL Diagram 27 Connection of Flat plate collector K to solid fuel boiler WBS solar water tank SON buffer tank P and three way valve...

Страница 20: ...INSTALLATION and OPERATION MANUAL TE TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL TE Diagram 28 Connection of Flat plate collector K to solid fuel boiler WBS solar water tank SON buffer tank...

Страница 21: ...g pressure pump operation hydraulic connections Checkup of heat carrier fluid replacement thereof 9 2 Cleaning of collectors from dust deposits fallen dry leaves and twigs Keeping the collector surfac...

Страница 22: ...tion unsuitable or incorrect use Failure to observe the installation use and maintenance instructions set forth in the installation manual of respective product Improper installation or use as well as...

Страница 23: ...mediate replacement of the product he has claimed warranty for before receiving the decision as to the claim said request shall be accompanied by a Purchase requisition from the Commercial Department...

Страница 24: ...e Mpa 0 6 Inlet Outlet N P R1 2 Inlet Outlet New Line N P Cu 22 Heat carrier flow rate l m2 h 50 Weight kg 33 38 31 33 36 38 Thickness of solar glass mm 4 2 Material of solar glass K Heat tempered pri...

Страница 25: ...chnical features of VTC type Evacuated tube collector Diagram 30 Elements of VTC type Evacuated tube collector 1 Manifold 2 Inlet Outlet sleeve 3 Evacuated glass tube 4 Holder and protector of evacuat...

Страница 26: ...tant plastic RAL 9005 Heat carrier pipes material type Copper Heat pipe TU 1 Coating of absorber Selective coating Manifold unit box material insulation Anodized aluminum Polyurethane foam 30 mm Effic...

Страница 27: ...ntal protection regulation 12 2 Recycling and waste disposal At the end of life cycle of each product its components are due to be disposed of in conformity with regulatory prescriptions According to...

Страница 28: ...garia t 359 54 874 555 f 359 54 874 556 e mail ftrade sunsystem bg 129 Vitosha Blvd 1000 Sofia Bulgaria t 359 02 952 24 05 f 359 02 952 67 20 e mail sunsofia sunsystem bg www sunsystem bg ISO 9001 200...

Отзывы: