Страница 2: ...opyright 2003 Sun Microsystems Inc 4150 Network Circle Santa Clara Californie 95054 Etats Unis Tous droits r serv s Sun Microsystems Inc a les droits de propri t intellectuels relatants la technologie...

Страница 3: ...1 5 Cabinet Floor Caster Weight Load 1 12 1 6 Planning Your Access Route 1 13 2 Environmental Requirements 2 1 2 1 Environmental Requirements 2 1 2 1 1 Suggested Ambient Temperatures 2 2 2 1 2 Suggest...

Страница 4: ...Name 4 6 4 4 2 Internal Networks 4 6 4 4 2 1 I1 Network 4 7 4 4 2 2 I2 Network 4 8 4 4 3 External Networks 4 8 4 4 3 1 System Controller 4 9 4 4 3 2 Domains 4 10 5 Site Planning Checklists 5 1 5 1 Sy...

Страница 5: ...2 Proposed Sun Fire 15K 12K Systems Configuration 2 7 FIGURE 2 3 Proposed Sun Fire 15K 12K Systems Multiple Configuration 2 8 FIGURE 3 1 Sun Fire 15K 12K Systems Power Connections Redundant Power Dou...

Страница 6: ...vi Sun Fire 15K 12K Systems Site Planning Guide June 2003...

Страница 7: ...iguration Summary 3 6 TABLE 4 1 Sun Fire 15K 12K Systems Network 4 1 TABLE 4 2 Sun Fire 15K 12K Systems Network Interfaces 4 2 TABLE 4 3 Sun Fire 15K 12K Systems Platform Name Worksheet 4 6 TABLE 4 4...

Страница 8: ...viii Sun Fire 15K12K Systems Site Planning Guide June 2003...

Страница 9: ...kV Signal Lines EN61000 4 5 1 kV Line Line 2 kV Line Gnd Power Lines EN61000 4 6 3 V EN61000 4 8 3 A m EN61000 4 11 Pass EN61000 3 2 1995 Pass EN61000 3 3 1995 Pass EC Type Examination Certificates E...

Страница 10: ...x Sun Fire 15K 12K Systems Site Planning Guide June 2003...

Страница 11: ...ided along with environmental and power specifications needed for this planning How This Book Is Organized Chapter 1 provides suggested network configuration and worksheets for site planning setups Ch...

Страница 12: ...ce contacting TABLE P 1 Related Documentation Application Title Service Sun Fire 15K 12K Systems Read Me First Service Sun Fire 15K 12K Systems Getting Started Service Sun Fire 15K 12K Systems Unpacki...

Страница 13: ...port Control laws and might be subject to the export or import laws in other countries Nuclear missile chemical biological weapons or nuclear maritime end uses or end users whether direct or indirect...

Страница 14: ...xiv Sun Fire 15K 12K Systems Site Planning Guide June 2003...

Страница 15: ...and amount of networking cables needed Determine all dynamic system domain information by reviewing TABLE 4 2 Section 4 2 System Setup Information on page 4 2 Determine the space requirements and loc...

Страница 16: ...ected I O expansion racks house additional I O disk or tape subsystems Additionally each I O expansion rack contains AC distribution subsystems for use with the I O subsystems Multiple cabinets may be...

Страница 17: ...Chapter 1 Physical Specifications 1 3 FIGURE 1 2 Sun Fire 15K 12K Systems Cabinet Sample Configurations Sample configuration A Top view Sample configuration B Top view Sample configuration C Top view...

Страница 18: ...121 9 cm 75 5 in 191 8 cm Shipping weight maximum Cabinet 15K 2 513 7 lb 1 142 6 kg 12K 2 191 5 lb 996 1 kg Shipping kit 80 0 lb 36 4 kg Pallet 365 0 lb 165 9 kg 2 958 7 lb 1 344 9 kg 2 636 5 lb 1 198...

Страница 19: ...ly 6 X 42 2 lb 19 2 kg 253 2 lb 115 1 kg 253 2 lb 115 1 kg 253 2 lb 115 1 kg Fan trays 8 X 24 0 lb 11 0 kg 192 0 lb 87 3 kg 192 0 lb 87 3 kg 192 0 lb 87 3 kg Sun Fireplane interconnect 1 X 30 1 lb 13...

Страница 20: ...1 X 19 5 lb 8 9 kg 19 5 lb 8 9 kg X___ ________ _______ ________ _______ hsPCI assembly plus boot disk 1 X 20 0 lb 9 1 kg 20 0 lb 9 1 kg X___ ________ _______ ________ _______ MaxCPU 1 X 13 0 lb 5 9 k...

Страница 21: ...n Fire 15K 12K Systems Shipping Crate Dimensions 80 0 in 203 2 cm System cabinet Fork lift side Pallet jack side 75 5 in 191 8 cm 32 0 in 81 3 cm 12 0 in 30 5 cm 48 0 in 121 9 cm 28 75 in 73 0 cm 20 3...

Страница 22: ...holes in the front and rear of the lower chassis can also be used to hold down or secure the system frame to the floor of your facility 84 6 cm 33 3 in 191 8 cm 75 5 in 43 8 cm 17 25 in see Note 3 0...

Страница 23: ...Cabinet Clearance Dimensions Shipping pallet 67 5 in 171 5 cm tiedown bracket 33 3 in 84 6 cm 155 5 in 395 0 cm 2 95 in 17 25 in 43 8 cm System cabinet top view 7 5 cm 44 0 in 111 8 cm Service clearan...

Страница 24: ...rectly under the base of the system FIGURE 1 6 illustrates the floor cutouts for cables Suggested locations for perforated floor panels or floor grilles are shown in FIGURE 2 2 Use the floor layout di...

Страница 25: ...area see dotted lines any unused cable opening should be filled with a suitable material to block airflow 30 4 in 77 2 cm 33 3 in 84 6 cm Air inlet 64 5 in 163 8 cm 56 32 in 143 1 cm 51 3 in 130 3 cm...

Страница 26: ...d to a one square inch area Review TABLE 1 3 for the Sun Fire 15K 12K systems information on pounds per square foot on a building structure Note The Sun Fire 15K 12K systems require a shared aisle spa...

Страница 27: ...crate and its dimensions are shown in FIGURE 1 3 A pallet jack is required to move each shipping crate to the system location Sun Microsystems suggests that you leave each system cabinet in its shippi...

Страница 28: ...1 14 Sun Fire 15K 12K Systems Site Planning Guide June 2003...

Страница 29: ...ustomer selected I O expansion racks If the system is significantly colder 40 F 4 C or colder than the environment in which you will install it leave the system in its shipping crate at its final dest...

Страница 30: ...5 to 50 because this range Helps protect computer systems from corrosive problems associated with high humidity levels Provides the greatest operating time buffer in the event of environmental control...

Страница 31: ...the site is able to accommodate the appropriate environmental requirements The numbers in this manual account for these requirements To facilitate future upgrades always provide environmental cooling...

Страница 32: ...ontrol 2 2 x 182 364 x 3 4 1237 6 SC peripheral 2 2 x 103 206 x 3 4 700 4 Fan trays 8 8 x 166 1328 x 3 4 4515 2 Centerplane support 2 2 x 18 36 x 3 4 122 4 Sun Fireplane 1 1 x 204 204 x 3 4 693 6 Expa...

Страница 33: ...inet FIGURE 2 1 Sun Fire 15K 12K Systems Air Flow Cabinet rear perforated Cabinet front vented doors Air flow raised floor Air Front Air flow Distance Distance between systems 3 4 ft between systems 3...

Страница 34: ...ed on floor tiles delivering 600 cubic feet per minute cfm cooling for each tile FIGURE 2 3 shows a floor plan layout for multiple Sun Fire 15K 12K systems Note In higher power consumption configurati...

Страница 35: ...ire 15K 12K Systems Configuration Note Casters and leveling feet located at the corners of each cabinet are to be positioned only on solid floor tiles Suggested floor plan Fully configured system 24 k...

Страница 36: ...Sun Fire 15K 12K Systems Multiple Configuration Note The system power cables are 157 5 in 400 1 cm long Consider the maximum distance to a power receptacle when positioning the system Solid tile Perf...

Страница 37: ...wer sources However if the computer equipment is subjected to repeated power interruptions and fluctuations it is susceptible to a higher component failure rate than it would be with a stable power so...

Страница 38: ...gurations Contact a Sun Microsystems System Engineer for power cord quantity information when choosing the proper number of power cords needed for your system configuration TABLE 3 1 Facility Power Re...

Страница 39: ...ystems Power Connections Redundant Power Double Power Source Power Source A and B Power AC0 AC1 AC0 AC1 AC0 AC1 To Power source Power source System cabinet A B source A To Power source B Front power s...

Страница 40: ...2 Sun Fire 15K 12K Systems Power Connections High Reliability Power Single Power Source One Power Source Power Front power supplies Rear power supplies To power source A System cabinet source A AC0 A...

Страница 41: ...K Systems Power Connections Basic Single Power Single Power Source One Power Source No Redundancy Not Advisable Power Front power supplies Rear power supplies source A System cabinet AC0 AC1 AC0 AC1 A...

Страница 42: ...ly It is important to note that power cords are grounded through the receptacle and the ground cable must reference a common earth ground Otherwise a difference in ground potential can be introduced C...

Страница 43: ...to procure the grounding cable A grounding cable is not shipped with the system 3 Attach the ground cable to the system behind the kick plate at the bottom of the frame base as shown in FIGURE 3 4 FIG...

Страница 44: ...3 8 Sun Fire 15K 12K Systems Site Planning Guide June 2003...

Страница 45: ...networks are defined in TABLE 4 1 TABLE 4 1 Sun Fire 15K 12K Systems Network Network Designation Description I1 1 Domain to SC management network Domains A R communicate with the SC over this network...

Страница 46: ...I1 are required 2 A maximum of two user communities can be cabled to the SC This restriction does not apply to domains TABLE 4 2 Sun Fire 15K 12K Systems Network Interfaces Interface Designation Descr...

Страница 47: ...his is driven by the security policy of the site The main SC and the spare SC must have identical network cabling For HA configurations redundancy can be further increased within each user community b...

Страница 48: ...work connection to the system controller does not induce an SC failover Disadvantages Limited to a single user community cabled to the system controller FIGURE 4 1 Highly Available Network Configurati...

Страница 49: ...System Controller Disadvantages A failure of any single network connection induces an SC failover FIGURE 4 2 Dense Network Configuration Community A Community B SC0 CA F CB Spare SC Domain A SC0 CB S...

Страница 50: ...the default prefix for host names of internal network interfaces see Section 4 4 2 Internal Networks on page 4 6 This platform name must consist of alphanumeric characters using the alpha character fi...

Страница 51: ...atic assignment of a host name IP address for the I1 network is highly suggested If performing a manual installation record the host names and IP addresses for the I1 interfaces in the worksheet provi...

Страница 52: ...in the worksheet provided in TABLE 4 6 4 4 3 External Networks Enter the IP networks and subnet masks in the worksheet provided in TABLE 4 7 Each subnet must be unique within the network The System C...

Страница 53: ...hen using the HA configuration Use the worksheet in TABLE 4 9 to record this information Note The logical and pathgroup specific IP address for a community must use the same IP network and subnet as t...

Страница 54: ...unities or user communities not previously defined record that information on a separate sheet of paper TABLE 4 10 Community Host Name IP Addresses for the Domain Worksheet Cx Network Interface User C...

Страница 55: ...y Sun Microsystems training course ES 421 Sun Fire 15K 12K Systems Server Administration Is a security clearance required for this site If so has local Sun Microsystems Enterprise Services Management...

Страница 56: ...ave sufficient power receptacles been ordered for the system cabinet and each customer selected I O expansion rack TABLE 3 2 Ensure the power receptacles are within 14 ft 427 cm cable length of the sy...

Страница 57: ...h configured network controller been ordered Have all IP addresses for each configured network controller been assigned Are the Ethernet connections available to the user s network 5 6 Planning Your A...

Страница 58: ...cess Route on page 1 13 Are the elevator and elevator door dimensions adequate TABLE 1 1 Is the elevator weight capacity adequate TABLE 1 1 Does each ramp incline in the access route have an incline t...

Страница 59: ...ooling Requirements Worksheet Chapter 3 TABLE 3 2 Facility Power Cable Requirements Worksheet Chapter 4 TABLE 4 3 Sun Fire 15K 12K Systems Platform Name Worksheet TABLE 4 4 IP Networks Subnet Masks fo...

Страница 60: ...A 2 Sun Fire 15K 12K Systems Site Planning Guide June 2003...

Страница 61: ...14 0 lb 6 4 kg 14 0 lb 6 4 kg Doors rear left 1 X 17 5 lb 8 0 kg 17 5 lb 8 0 kg 17 5 lb 8 0 kg 17 5 lb 8 0 kg Power supply 6 X 42 2 lb 19 2 kg 253 2 lb 115 1 kg 253 2 lb 115 1 kg 253 2 lb 115 1 kg Fa...

Страница 62: ...tes 1 X 19 5 lb 8 9 kg 19 5 lb 8 9 kg X ___ ________ _______ ________ _______ hsPCI assembly plus boot disk 1 X 20 0 lb 9 1 kg 20 0 lb 9 1 kg X ___ ________ _______ ________ _______ MaxCPU 1 X 13 0 lb...

Страница 63: ...System Control 2 2 x 182 364 x 3 4 1237 6 SC peripheral 2 2 x 103 206 x 3 4 700 4 Fan trays 8 8 x 166 1328 x 3 4 4515 2 Centerplane support 2 2 x 18 36 x 3 4 122 4 Sun Fireplane 1 1 x 204 204 x 3 4 6...

Страница 64: ...A 6 Sun Fire 15K 12K Systems Site Planning Guide June 2003...

Страница 65: ..._ Contact a Sun Microsystems System Engineer for power cord quantity information when choosing the proper number of power cords needed for your system configuration Frame Type Number of Cabinets Numbe...

Страница 66: ...A 8 Sun Fire 15K 12K Systems Site Planning Guide June 2003...

Страница 67: ...Appendix A Power and Cooling and System Setup Worksheets A 9 Sun Fire 15K 12K Systems Platform Name Worksheet Record Date ______________ Platform Name...

Страница 68: ...A 10 Sun Fire 15K 12K Systems Site Planning Guide June 2003...

Страница 69: ...x A Power and Cooling and System Setup Worksheets A 11 IP Networks Subnet Masks for Internal Network Worksheet Record Date ______________ Network IP Network Subnet Mask I1 255 255 255 224 I2 255 255 2...

Страница 70: ...A 12 Sun Fire 15K 12K Systems Site Planning Guide June 2003...

Страница 71: ...m a Domain B DB I1 platform b Domain C DC I1 platform c Domain D DD I1 platform d Domain E DE I1 platform e Domain F DF I1 platform f Domain G DG I1 platform g Domain H DH I1 platform h Domain I DI I1...

Страница 72: ...A 14 Sun Fire 15K 12K Systems Site Planning Guide June 2003...

Страница 73: ...A Power and Cooling and System Setup Worksheets A 15 Host Name IP Addresses for the I2 Network Worksheet Record Date ______________ Interface Hostname IP Address SC0 I2 platform sc0 i2 SC1 I2 platfor...

Страница 74: ...A 16 Sun Fire 15K 12K Systems Site Planning Guide June 2003...

Страница 75: ...A Power and Cooling and System Setup Worksheets A 17 IP Networks Subnet Masks for External Networks Worksheet Record Date ______________ User Community Network IP Network Subnet Mask Community A Comm...

Страница 76: ...A 18 Sun Fire 15K 12K Systems Site Planning Guide June 2003...

Страница 77: ...mmunity Host Name IP Addresses for the System Controller Worksheet Record Date ______________ Cx Network Interface User Community IP Address System Controller 0 Ethernet System Controller 0 Ext Ethern...

Страница 78: ...A 20 Sun Fire 15K 12K Systems Site Planning Guide June 2003...

Страница 79: ...up Worksheets A 21 Host Name IP Addresses for the SC Logical Interface Worksheet Record Date ______________ User Community Logical Host Name Logical IP Address SC0 Pathgroup IP Address SC1 Pathgroup I...

Страница 80: ...A 22 Sun Fire 15K 12K Systems Site Planning Guide June 2003...

Страница 81: ...__________ Cx Network Interface User Community Hostname IP Address Domain A DA Cx Domain B DB Cx Domain C DC Cx Domain D DD Cx Domain E DE Cx Domain F DF Cx Domain G DG Cx Domain H DH Cx Domain I DI C...

Страница 82: ...A 24 Sun Fire 15K 12K Systems Site Planning Guide June 2003...

Страница 83: ...B 1 APPENDIX B Compliance Statements...

Страница 84: ...B 2 Sun Fire 15K 12K Systems Site Planning Guide June 2003...

Страница 85: ...e limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment This equipment generates uses and can radiate radio frequ...

Страница 86: ...B 4 Sun Fire 15K 12K Systems Site Planning Guide June 2003 BSMI Class A Notice The following statement is applicable to products shipped to Taiwan and marked as Class A on the product compliance label...

Страница 87: ...ications to Equipment Do not make mechanical or electrical modifications to the equipment Sun Microsystems is not responsible for regulatory compliance of a modified Sun product Placement of a Sun Pro...

Страница 88: ...duct is shipped with a grounding type three wire power cord To reduce the risk of electric shock always plug the cord into a grounded power outlet Caution The power switch of this product functions as...

Страница 89: ...hen oder elektrischen nderungen an den Ger ten vor Sun Microsystems bernimmt bei einem Sun Produkt das ge ndert wurde keine Verantwortung f r die Einhaltung beh rdlicher Vorschriften Aufstellung von S...

Страница 90: ...zu reduzieren schlie en Sie das Kabel nur an eine fachgerecht verlegte geerdete Steckdose an Achtung Der Ein Aus Schalter dieses Ger ts schaltet nur auf Wartezustand Stand By Modus Um die Stromzufuhr...

Страница 91: ...dification m canique ou lectrique au mat riel Sun Microsystems n est pas responsable de la conformit r glementaire d un produit Sun qui a t modifi Positionnement d un produit Sun Conformit SELV S curi...

Страница 92: ...que avec votre produit Sun Attention votre produit Sun a t livr quip d un cordon d alimentation trois fils avec prise de terre Pour carter tout risque d lectrocution branchez toujours ce cordon dans u...

Страница 93: ...responsable del cumplimiento de las normativas de seguridad en los equipos Sun modificados Ubicaci n de un producto Sun Cumplimiento de la normativa SELV El estado de la seguridad de las conexiones de...

Страница 94: ...stico para conectar sus productos Sun Precauci n Con el producto Sun se proporciona un cable de alimentaci n con toma de tierra Para reducir el riesgo de descargas el ctricas con ctelo siempre a un e...

Страница 95: ...laktigt batteribyte Anv nd samma batterityp eller en ekvivalent typ som rekommenderas av apparattillverkaren Kassera anv nt batteri enligt fabrikantens instruktion ADVARSEL Litiumbatteri Eksplosionsfa...

Страница 96: ...B 14 Sun Fire 15K 12K Systems Site Planning Guide June 2003...

Страница 97: ...America 3 2 power requirements 3 2 components system 1 2 configuration basic network 4 4 multiple cabinet 1 2 network 4 1 4 3 samples 1 3 system diagram proposed 2 7 connection Ethernet 4 1 network 4...

Страница 98: ...environmental requirements 2 1 I I O expansion racks 1 2 interface network 4 2 L load weight floor 1 2 loading dock 1 13 M moving the crates 1 13 N network configuration 4 1 configuration basic 4 4 i...

Страница 99: ...klist 5 1 preparation process 1 1 specifications environmental 2 1 physical 1 4 temperature 2 1 system components 1 2 configuration diagram proposed 2 7 power and cooling requirements worksheet 2 4 se...

Страница 100: ...Index 4 Sun Fire 15K 12K Site Planning Guide June 2003...

Отзывы: